25.02.2013 Views

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Keywords<br />

PROJECT-LIFE<br />

BLOCK<br />

MIN-PEAK-LOAD<br />

FORTRAN<br />

Var i ab 1 es<br />

E,CN<br />

Y1<br />

Engineering<br />

Variables<br />

Tproject<br />

Tleft<br />

BLOK and/or Qblock<br />

UBLK(1, I, J)<br />

if BLOCK, COST<br />

method is used<br />

EMON<br />

ENPEAK<br />

UDATA(5,J)<br />

ENUSE<br />

XlI)<br />

X(2)<br />

YEAR<br />

PERIOD<br />

SHIFT<br />

Qmon<br />

Qp-mo<br />

Qpeak<br />

Qpeak-min<br />

Qused<br />

YR<br />

V.125<br />

Description<br />

the length of the project<br />

in years<br />

the years remalnlng in the<br />

current overhaul or equipment<br />

replacement cycle<br />

the block of<br />

rently being<br />

energy units<br />

energy curprocessed<br />

in<br />

energy consumption in the<br />

units the energy will be<br />

billed in (therms, kwhs,<br />

gallons, etc.)<br />

monthly peak load in Btus<br />

peak load that occurred<br />

during the year in Btus<br />

the minimum peak load corresponding<br />

to a minimum<br />

demand surcharge<br />

energy consumption in Btus<br />

the present value of the<br />

equipment replacement costs<br />

incurred over the entire<br />

life cycle period<br />

the present value of the<br />

minor overhaul costs incurred<br />

over the entire 1 i fe<br />

cycle period<br />

the year in which an overhaul<br />

occurs<br />

the number of<br />

replacement<br />

cycle<br />

years in each<br />

or overhaul<br />

the fraction of a cycle that<br />

occurred prior to the current<br />

simulation period

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!