25.02.2013 Views

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S. CHAPTER V INDEX (for non-solar equipment) (Cont.)*<br />

heat recovery: (Cont.)<br />

supply vs. demand, 80-83<br />

wasted recoverable heat, 77, 80<br />

heater, hot water, domestic/process, electric:<br />

capacity, rated or design, 6, 9-10, 12-15, 25<br />

capacity adjustment, 5<br />

electric input ratiO, 9-10, 25-25<br />

electrical consumption, 5, 9-10, 15, 25-25<br />

heat loss, 25<br />

introduction, 1-4<br />

part load, 6, 9-10<br />

program variables, 5-7, 16-18<br />

heater, hot water, domestic/process, fossil fuel:<br />

capacity, rated or design, 5, 8, 12-15, 23<br />

capacity adjustment, 5<br />

electric input ratio, 23-24<br />

electrical consumption, 23-24<br />

fuel consumption, 6, 8, 16, 23<br />

heat input ratiO, 8-9, 23-24<br />

introduction, 1-4, 18<br />

part load, 5, 8-10, 23-24<br />

program variables, 5-7, 15-18<br />

heating coil (SYSTEMS). See main, preheat, or zone coil (SYSTEMS)<br />

limitations, of simulation, 4-5<br />

load allocation:<br />

default, 1, 15<br />

between diesel- and gas-turbine generators, 117-118<br />

between different sizes of equipment, 4, 31, 103, 118-120<br />

introduction, 92, 98, 102-104, 114<br />

to optimize cooling load, 31, 103-113<br />

to optimize electrical load, 103, 114-118<br />

prevention of cycling and false loading with, 101-102<br />

program variables, 92-97<br />

with sequence of equipment operation, 99-100<br />

total operating capacity, 98-99<br />

loads, from LOADS and SYSTEMS, 2-4, 12, 15<br />

main coil, cooling or heating (SYSTEMS), 1-4, 26<br />

off-desi9n conditions. See capacity adjustment<br />

for the desired type of equipment<br />

off-rated conditions. See capacity adjustment<br />

for the desired type of equipment<br />

overload, 4, 76, 101<br />

pipes. See distribution system, for heating and cooling fluids<br />

precedence rule, of equip:nent operation, 13<br />

preheat coil (SYSTEMS), 1-4<br />

pumps. See distribution system<br />

reheat coil. See zone coil<br />

sizing. See equipment sizing<br />

*All page numbers are to be preceeded by "V."<br />

V.306

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!