<strong>DOMINO</strong> <strong>Panel</strong> <strong>Formwork</strong><br />
A13 Concreting Scaffold<br />
Guardrails<br />
Consisting of:<br />
– Handrail Post Holder <strong>DOMINO</strong> (65)<br />
– Handrail Post HSGP (66)<br />
(Fig. A13.04)<br />
With a fall-height > 3.0 m, guardrails<br />
are required on the opposite side of the<br />
concreting scaffiold.<br />
Assembly is carried out horizontally. In<br />
cases of vertical assembly use e.g. a<br />
mobile scaffold.<br />
Secure boards with nails!<br />
Assembly<br />
1. Slide back fastening bolts (63.1) and<br />
hook in Handrail Post Holder <strong>DOMINO</strong><br />
(65) in the connecting holes of the panel.<br />
2. Secure with Cotter Pins.<br />
3. Insert Handrail Post HSGP (66).<br />
4. Install guardrails and secure with<br />
nails.<br />
(Fig. A13.05)<br />
When erecting, make sure that the<br />
guardrails are not damaged by the lifting<br />
gear.<br />
Assembly is only possible on vertical<br />
struts.<br />
With extended formwork units, the<br />
guardrails are mounted as part of the<br />
pre-assembly process.<br />
Dismantling<br />
Do not lay the formwork panel on the<br />
Handrail Post Holder <strong>DOMINO</strong> (65).<br />
26<br />
Fig. A13.04<br />
Fig. A13.05<br />
65<br />
66<br />
max. prop spacing 2.0 m<br />
max. width of influence 2.0 m<br />
63.1<br />
Assembly Instructions for Standard Configuration