<strong>DOMINO</strong> <strong>Panel</strong> <strong>Formwork</strong><br />

A13 Concreting Scaffold<br />

Guardrails<br />

Consisting of:<br />

– Handrail Post Holder <strong>DOMINO</strong> (65)<br />

– Handrail Post HSGP (66)<br />

(Fig. A13.04)<br />

With a fall-height > 3.0 m, guardrails<br />

are required on the opposite side of the<br />

concreting scaffiold.<br />

Assembly is carried out horizontally. In<br />

cases of vertical assembly use e.g. a<br />

mobile scaffold.<br />

Secure boards with nails!<br />

Assembly<br />

1. Slide back fastening bolts (63.1) and<br />

hook in Handrail Post Holder <strong>DOMINO</strong><br />

(65) in the connecting holes of the panel.<br />

2. Secure with Cotter Pins.<br />

3. Insert Handrail Post HSGP (66).<br />

4. Install guardrails and secure with<br />

nails.<br />

(Fig. A13.05)<br />

When erecting, make sure that the<br />

guardrails are not damaged by the lifting<br />

gear.<br />

Assembly is only possible on vertical<br />

struts.<br />

With extended formwork units, the<br />

guardrails are mounted as part of the<br />

pre-assembly process.<br />

Dismantling<br />

Do not lay the formwork panel on the<br />

Handrail Post Holder <strong>DOMINO</strong> (65).<br />

26<br />

Fig. A13.04<br />

Fig. A13.05<br />

65<br />

66<br />

max. prop spacing 2.0 m<br />

max. width of influence 2.0 m<br />

63.1<br />

Assembly Instructions for Standard Configuration