Ho Chi Minh City Metro Rail System Project <strong>Final</strong> <strong>Report</strong> - Revised<br />
Management Authority for Urban Railways Chapter 7 – Social and Environmental Safeguards<br />
Type of impact Eligibility/<br />
application<br />
structures (fully<br />
affected area or<br />
partially affected but<br />
non-affected part<br />
could not be retained).<br />
2.2. For partially<br />
affected structures<br />
(non-affected part<br />
can remain and is<br />
viable within normal<br />
safety standards)<br />
3. Living facilities<br />
(such as water supply<br />
connection; cable<br />
telephone, cable TV,<br />
electricity connection<br />
etc.)<br />
4. Affected business<br />
(both running by the<br />
house owners and<br />
tenant users)<br />
in absence of it, APs<br />
recognized as stable<br />
occupants by the local<br />
authority or simply APs<br />
included in the census<br />
and APs inventory.<br />
Existing houses affected<br />
All APs (owners or<br />
lessees of the structures)<br />
- All AP who lease<br />
houses of the owners for<br />
businesses.<br />
Entitlement policy Implementation measure<br />
electricity meter, etc.<br />
- The reasonable rental loss due to the project will be<br />
compensated.<br />
Additional assistance to improve new houses for HH with a<br />
value of affected house less than the cost to build a house<br />
of type 4 with area of 30 m 2 .<br />
- Cash compensation for demolished area at replacement<br />
cost.<br />
- Cost for renting equivalent premises for the period of<br />
station construction plus 6 months for reconstruction of<br />
properties.<br />
- District to carry out DMS to identify if APs have<br />
remaining areas sufficient to rebuild the structure or<br />
not. Disseminate compensation plan to APs and post<br />
it at ward office as required by laws.<br />
- APs have choice (i) cash for self-construction for<br />
their structures or (ii) request the project to provide<br />
new structures at resettlement site.<br />
- Compensation will be provided to APs at least 4<br />
months prior to displacement for house type 4 and<br />
more than 5 months for house types 1, 2 and 3.<br />
- Pay AP at the replacement value of the house and<br />
other fixed assets in the year the compensation is<br />
paid.<br />
- Compensation paid at least 2 months before<br />
deadline for house demolition request.<br />
- Compensation for cost of installation and connection fees - Compensation will be paid at least 1 month before<br />
request of demolishing the house.<br />
- The reasonable income loss due to the project will be<br />
compensated.<br />
- Additional assistance to restore the livelihood through<br />
feasible restoration programs/ activities.<br />
- Identify APs with and without tax payment to local<br />
authorities.<br />
- Consult with APs, local authorities and NGOs for<br />
feasible restoration programs/ activities.<br />
- Compensate for losses and allowance for a<br />
7-3