21.03.2013 Views

Starquake.pdf

Starquake.pdf

Starquake.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

"We will need to have a new power generator up and operating by then," said Steel-Slicer. "Call the<br />

senior engineering staff up to the control deck. I will want your senior officers there, too. Place four<br />

spacers at the outer rail as lookouts. We are far from any city, but we did pass over someone on the way<br />

in." The crew deck on Eagle was compact, so it was not long before the senior staff gathered.<br />

"Now that we are on the crust, we spacers are out of a job until you engineers get this gravity catapult<br />

reactivated and bring down a ship for us to fly," said Steel-Sheer. "With Cliff-Web gone, I am going to<br />

assume the responsibility for management of the engineering contingent. I want Captain Otis-Elevator to<br />

assume responsibility for the spacer contingent. Unless one of the spacers has a technical ability that the<br />

engineers can use, their job is support, security, and interaction with the Egg cheela. It is a long way from<br />

flying about in ultrasophisticated spacecraft to preparing food and interacting with barbarians, but the<br />

sooner the engineers can rebuild technology in this Bright-Afflicted spot, the sooner we can be back into<br />

space."<br />

"We are all in this together," Otis-Elevator said. "My spacers will do anything that needs to be done."<br />

"It would help if we didn't have to use any energy for the food generators," said Steel-Slicer. "I noticed<br />

that we scattered a herd of animals as we landed. If you can form a food-gathering crew and find a few<br />

of those animals to feed us, your crew would not only help our energy crisis but be real heroes to a<br />

hungry group of engineers."<br />

"We will return shortly." Otis-Elevator lead his senior officers off.<br />

"Our first task will be to get power," Steel-Slicer told the engineers. "Who is in charge of the miniature<br />

power plant?"<br />

"I am," answered Engineer Power-Pack. "My team is loading the parts on the elevator now."<br />

"I will go down with them," said Steel-Slicer. "What else will you need?"<br />

"A mass separator and a monopole generator," said Power-Pack. "We will need hundreds of meters of<br />

high-strength pipe to reach the neutron-rich magma below the crust."<br />

"They will be ready when you need them," Engineer Delta-Mass assured him. "Guaranteed leakless."<br />

"I think managing a Web Construction Company project is going to be the easiest job I ever had,"<br />

Steel-Slicer said. "Let's ripple treads."<br />

"The elevator seems to be moving very slowly," said Steel-Slicer. "Is it because of the weight of the<br />

power plant parts?"<br />

"No," said Power-Pack. "Cliff-Web programmed the elevator controls for maximum energy extraction<br />

rather than maxi-<br />

mum safe descent speed. As we offload Eagle, the elevator motors will recharge the energy<br />

accumulators. Cliff-Web always liked to find ways of lowering the cost of projects."<br />

"In this case, he may have saved our hides," said Steel-Slicer. "He certainly was a remarkable engineer."<br />

"Yes, he was," Power-Pack agreed. The elevator deck remained silent for the rest of the ride down.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!