Contribution to Switzerl<strong>and</strong>’s electricity supply<br />
4<br />
Water vapour evaporating from the cooling<br />
tower.<br />
1000<br />
100<br />
10<br />
1<br />
0.1<br />
0.01<br />
0.001<br />
0.0001<br />
Emission of radioactive substances (annual dose in mSv)<br />
Average dose for the Swiss population due to natural occurrences, with fluctuation range<br />
Maximum allowable dose in the vicinity of the nuclear power plant due to its emissions<br />
Threshold of importance according to the Swiss Radiation Protection Ordinance<br />
Actual dose in the vicinity due to the nuclear power plant<br />
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009<br />
The radioactive releases are well below the authorised limits.<br />
average capacity factor of 90 %. Over the<br />
years, the cost of generating electricity fell<br />
from 6.3 centimes per kWh in 1980 to 4.64<br />
centimes per kWh in 2009.<br />
Both minor <strong>and</strong> major modifications have<br />
been approved by shareholders, with the aim<br />
of constantly improving on the operational<br />
<strong>and</strong> safety parameters of the plant. These<br />
have included advanced fuel management,<br />
improvements to turbine efficiency <strong>and</strong> the<br />
retrofitting of a pressure relief system for the<br />
reactor coolant system. Together with reduced<br />
outage periods, this has contributed<br />
significantly to the 15 % increase in net electricity<br />
generation that has been achieved<br />
since the KKG was first brought into operation,<br />
corresponding to an extra 2 billion kWh<br />
or so per year. During this time, the radiological<br />
releases to the environment <strong>and</strong> staff<br />
radiation doses have been way below the<br />
limits set by the authorities.<br />
High safety st<strong>and</strong>ards, reliable operation,<br />
low emission values, cost-efficiency <strong>and</strong><br />
also a permanent dialogue with the public<br />
have all helped to ensure that the KKG is<br />
readily accepted by the local community.<br />
The population of the canton in which the<br />
KKG is located <strong>and</strong>, more particularly, the<br />
surrounding communities, made this very<br />
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �