4. PIPING PLAN: It is recommended be<strong>for</strong>e proceeding with the<br />

installation of a gas piping system a piping sketch or plan be<br />

prepared showing the proposed location of the piping as well<br />

as the pipe size of different branches. Adequate consideration<br />

should be given to future dem<strong>and</strong>s <strong>and</strong> provisions made <strong>for</strong><br />

added gas service. If a piping plan is provided, <strong>Questar</strong> <strong>Gas</strong><br />

Company will be glad to review it without charge or obligation.<br />

5. GAS PIPING MATERIALS: These recommendations apply to<br />

all gas piping run on the customer’s side of the meter. Since gas<br />

piping will <strong>for</strong>m a permanent part of the building, inside <strong>and</strong><br />

above ground piping shall be st<strong>and</strong>ard weight iron or steel<br />

(galvanized or black), malleable iron fittings <strong>and</strong> approved shutoff<br />

valves or corrugated stainless steel tubing system. For ferrous<br />

gas piping underground installation see Page 32.<br />

Copper pipe or tubing shall not be installed in any piping <strong>for</strong><br />

gas.<br />

6. PLASTIC PIPING MATERIAL: Plastic polyethylene pipe<br />

materials <strong>and</strong> compression couplings must be approved <strong>for</strong><br />

natural gas applications <strong>and</strong> must be installed underground.<br />

All plastic pipe <strong>and</strong> fittings must con<strong>for</strong>m to ASTM D2513 ( 60<br />

psi <strong>and</strong> above high density pipe approved 3408).<br />

Plastic pipe must be joined by individuals qualified in the heat<br />

fusion method of connecting pipe <strong>and</strong> fittings or approved<br />

mechanical fittings. A minimum number 18 insulated yellow<br />

copper tracer wire shall be installed with underground nonmetallic<br />

gas piping <strong>and</strong> shall terminate above grade at each end.<br />

Tracer wire shall not come in contact with plastic piping.<br />

Risers <strong>and</strong> prefabricated risers inserted with plastic pipe shall<br />

con<strong>for</strong>m to ASTM D2513, shall be metallic, have a space of 10<br />

inches from the bottom of the service valve <strong>and</strong> grade, <strong>and</strong><br />

shall be wrapped or coated to a point at least 6 inches above<br />

grade or protected in an approved manner. When a riser<br />

29