Table A.1 | Proposed Coal-Fired Power Plants in China<br />
PROVINCE PLANT DEVELOPER<br />
CAPACITY<br />
(MW)<br />
Global Coal Risk Assessment<br />
Anhui1 Wanneng hefei Power Plant Anhui Wanneng 600 NDRC Permitted<br />
Anhui2 huaibei Guoan Power Plant Phase II Anhui Wanneng and SDIC 2,000 Permitting<br />
Anhui3 huainan Pingwei Power Plant Phase III China Power Investment 2,000 Designing<br />
Anhui4 Wuhu Power Plant Phase V Unit 2 China Power Investment 600 NDRC Permitted<br />
Anhui5 huaibei Power Plant Unit 8&9 Datang 1,200 Planning<br />
Anhui6 Chuzhou Power Plant Datang 2,000 Permitting<br />
Anhui7 huainan Luohe Power Plant Phase Iv Datang 1,000 Permitting<br />
Anhui8 Anhui bengbu Power Plant Phase II Guodian 1,320 Permitting<br />
Anhui9 Chizhou Jiuhua Power Plant Unit 3&4 huadian 1,200 Planning<br />
Anhui10 huadian Lu’an Power Plant Unit 5&6 huadian 2,000 Planning<br />
Anhui11 huadian Liu’an Power Plant Unit 4 huadian and Liu’an Industrial<br />
Investment and Development Ltd.<br />
660 Planning<br />
Anhui12 huaibei Linhuan Power Plant Unit 1&2 huaibei mining Group 660 Planning<br />
Anhui13 huainan Fengtai Power Plant Phase II huainan mining Group and 1,320 Permitted, Preparing<br />
Zheneng<br />
Construction<br />
Anhui14 huainan Tianji Power Plant Phase II huainan mining Group and<br />
Shanghai Elec. Power Co.<br />
1,320 mEP Permitted, Tendering<br />
Anhui15 huaneng Chaohu Power Plant Unit 3&4 huaneng 1,200 Planning<br />
Anhui16 huaneng huainan-1 Power Plant Unit 1–4 huaneng 2,400 Planning<br />
Anhui17 huaneng huainan-2 Power Plant Unit 1–4 huaneng 2,400 Planning<br />
Anhui18 Anhui Xuancheng Power Plant Phase II SDIC 660 Planning<br />
Anhui19 Anqing Laofeng Power Plant Phase II Shenhua 2,000 Permitting<br />
Anhui20 huaibei Pingshan Power Plant Phase I Shenneng, huaibei mining Group,<br />
and Anhui Wanneng<br />
1,320 Permitting, Designing<br />
Anhui21 Anqing Power Plant Phase II Shenhua 2,000 Permitting<br />
Chongqing22 Xishui Erlang Power Plant China Power Investment 2,640 Feasibility Study Permitted,<br />
NDRC Permitting<br />
Chongqing23 huadian Fengjie Power Plant huadian 1,200 Permitting<br />
Fujian24 Datang Ningde Power Plant Phase III Datang 2,000 Feasibility Study, Tendering<br />
Fujian25 Fujian hongshan Thermal Power Plant Phase III Fujian Energy Co. 2,000 Planning<br />
Fujian26 Fujian yanshi Power Plant Unit 1&2 Fujian yanshi Power Gen Co. 600 Planning<br />
Fujian27 Fuzhou Kemen Power Plant Phase III huadian 2,520 Planning<br />
Fujian28 Fuzhou Power Plant Unit 6 huaneng 600 NDRC Permitted<br />
Gansu29 Chinalco Qingyang Zhengning Luochuan Power<br />
Generation Units<br />
Aluminum Co. of China 1,200 Planning<br />
Gansu30 CPI Wuwei Liangzhou Power Generation Units China Power Investment 2,000 Planning<br />
Gansu31 CPI Jiuquan Jinta Power Plant Phase I China Power Investment 2,000 Planning<br />
Gansu32 CPI Tianshui Qingshui Power Plant China Power Investment 2,000 Planning<br />
Gansu33 Datang yumen Changma Power Plant Datang 1,200 Planning<br />
Gansu34 Datang 803 Power Plant Datang 600 Planning<br />
Gansu35 Datang Jingtai Power Plant Phase II Datang 2,000 Planning<br />
STATUS<br />
continued next page<br />
WORKING PAPER | November 2012 | 27