Table A.1 | Proposed Coal-Fired Power Plants in China (continued)<br />

PROVINCE PLANT DEVELOPER<br />

CAPACITY<br />

(MW)<br />

Guangxi 68 heshan Power Plant Unit 11 Datang 600 Planning<br />

Guangxi 69 Chongzuo Power Plant Guodian 1,200 Planning<br />

Guangxi 70 Guodian Nanning Power Plant Phase II Guodian 2000 Planning<br />

Guangxi 71 Guigang Power Plant Unit 3&4 huadian 1,320 Planning<br />

Guangxi 72 beihai bebuwan Power Plant Phase II SDIC 1320 Permitting<br />

Guangxi 73 Shenhua Guohua Guangtou beihai Power Plant Shenhua 2,000 Permitting<br />

Global Coal Risk Assessment<br />

Guizhou 74 CPI Guizhou Qianxi Power Plant Phase II China Power Investment 1,320 Feasibility Study, Permitting<br />

Guizhou75 CPI Guizhou Qianbei Power Plant China Power Investment 1,320 Feasibility Study, Tendering<br />

Guizhou76 Guizhou bijie Coal Power base Chongqing Energy Investment Co.<br />

and China <strong>Resources</strong> holdings<br />

6,600 Planned, Site Selection<br />

Guizhou77 Datang Pannan Power Plant Unit 5&6 Datang 1,320 Permitting<br />

Guizhou78 Guizhou Faer Power Plant Unit 5&6 Guangdong yuedian 1,200 Planning<br />

Guizhou79 Guodian Anshun Power Plant Phase III Guodian 1,320 Permitting<br />

Guizhou80 huadian Anshun Power Plant huadian 1,200 Planning<br />

Hainan81 Guodian hainan Southwest Power Plant Guodian 700 Site Selection<br />

Hebei82 hebei Datang Weixian Power Plant Datang 1,200 Planning<br />

Hebei83 hebei Weizhou Power Plant Unit 1&2 hebei Weizhou Power <strong>Resources</strong> 1,320 Planning<br />

Hebei84 Caofeidian Power Plant Phase I huadian 2,000 Feasibility Study Permitted<br />

Hebei85 huadian Shijiazhuang Power Plant Unit 9&10 huadian 700 Planning<br />

Heilongjiang86 heilongjiang Suihua Thermal Power Plant Datang 700 Announced<br />

Heilongjiang87 Guodian Longxing Dahezhen Power Generation Units Guodian 4,000 Planning<br />

Heilongjiang88 Guodian Longxing Qixinghe South Power Generation<br />

Units<br />

Guodian 2,000 Planning<br />

Heilongjiang89 harbin-1 Thermal Power Plant Phase II huadian 600 Planning<br />

Heilongjiang90 hegang Power Plant Unit 4&5 huaneng 1,200 Planning<br />

Heilongjiang91 Luneng baoqing Chaoyang Coal mine Power Plant<br />

Phase I & II<br />

Luneng 5,200 Planning<br />

Heilongjiang92 Luneng baoqing Dahezhen Coal mine Power Plant Luneng 4,000 Planning<br />

Heilongjiang93 Luneng baoqing Qixinghe South Coal mine-2 Power<br />

Plant<br />

Luneng 4,000 Planning<br />

Henan94 Gongyi-2 Power Plant Unit 3&4 banpu Power Co. 200 Planning<br />

Henan95 Gucheng Power Plant Unit 3&4 China <strong>Resources</strong> holdings 2,000 Planning<br />

Henan96 Datang Gongyi Power Plant Datang 1,200 Permitting<br />

Henan97 hebi Fenghe-4 Power Plant Unit 1&2 henan Investment Co. and hebi<br />

Coal Group<br />

2,000 Planning<br />

Henan98 Xinxiang Zhongyi Power Plant henan Investment Co. and yunneg 1,200 Financed<br />

Henan99 henan Xinwang Power Plant Unit 1&2 henan Xinwang Power Co. 270 Planning<br />

Hubei100 Xisai Shan Power Plant Phase II Unit 4 huadian and meiya Power (Korea) 680 NDRC Permitted<br />

Hubei101 huaneng huazhong Power Plant Unit 1–4 huaneng 1,200 Planning<br />

Hubei102 Ezhou Power Plant Unit 5&6 hubei Energy Co. 2,000 Preparing Construction<br />