Table A.2 | Proposed Coal-Fired Plants in India (continued)<br />
STATE PLANT DEVELOPER<br />
CAPACITY<br />
(MW)<br />
Global Coal Risk Assessment<br />
Tamil Nadu Tuticorin Thermal Power Project Tamil Nadu Generation and<br />
Distribution Corporation and Neyveli<br />
Lignite Corp<br />
1,000 Construction<br />
Tamil Nadu Udangudi Power Station Tamil Nadu Generation and<br />
Distribution Corporation and bharat<br />
heavy Electricals Limited<br />
1,600 Advanced development<br />
Tamil Nadu Uppur Power Station (Thiruvadanai) Tamil Nadu Generation and<br />
Distribution Corporation<br />
1,600 Early development<br />
Tamil Nadu Vallur I Phase II NTPC and Tamil Nadu Generation and<br />
Distribution Corporation<br />
500 Construction<br />
Tamil Nadu Vallur I Power Station NTPC and Tamil Nadu Generation and<br />
Distribution Corporation<br />
1,000 Construction<br />
Uttar Pradesh Amauli Fatehpur Power Station Uttar Pradesh Power Corporation and<br />
Neyveli Lignite Corporation<br />
2,000 Proposed<br />
Uttar Pradesh Anpara-D Power Station Unit II UP Rajya Vidyut Nigam Ltd 500 Construction<br />
Uttar Pradesh Anpara-E Power Station UP Rajya Vidyut Nigam Ltd 1,320 Proposed<br />
Uttar Pradesh Auraiya Unitech Power Station Unitech machines 250 Proposed<br />
Uttar Pradesh bara Thermal Power Project Phase I Jaiprakash Power Ventures 1,980 Construction<br />
Uttar Pradesh bara Thermal Power Project Phase II Jaiprakash Power Ventures 1,320 Proposed<br />
Uttar Pradesh bargarh Power Station bajaj hindusthan 1,980 Early development<br />
Uttar Pradesh barkera mill Power Station bajaj hindusthan 80 Proposed<br />
Uttar Pradesh bhognipur Power Station Lanco 2,640 Early development<br />
Uttar Pradesh bilhaur Super Thermal Power Plant NTPC 1,320 Early development<br />
Uttar Pradesh Chola Power Station Tata Power 1,320 Proposed<br />
Uttar Pradesh Dopaha Thermal Power Plant Uttar Pradesh Power Corporation 1,980 Early development<br />
Uttar Pradesh Fatehpur Power Station Uttar Pradesh Power Corporation 1,320 Proposed<br />
Uttar Pradesh Feroz Gandhi Unchahar Power Project Stage IV NTPC 500 Proposed<br />
Uttar Pradesh harduaganj TPS Extn - Stage III (Kasimpur) Uttar Pradesh Rajya Vidyut 660 Proposed<br />
Uttar Pradesh Jawaharpur Thermal Project Jawaharpur Vidyut Utpadan Nigam 1,320 Proposed<br />
Uttar Pradesh Karchana Thermal Power Project Jaypee Group 1,980 Proposed<br />
Uttar Pradesh Lalitpur Power Project (mirchawar) bajaj hindusthan 1,980 Early development<br />
Uttar Pradesh meja Thermal Power Project NTPC and Uttar Pradesh Rajya Vidyut 1,320 Construction<br />
Uttar Pradesh NCTPP IGCC demonstration (Dadri) NTPC 100 Proposed<br />
Uttar Pradesh Obra Thermal Station extension UP Rajya Vidyut Nigam Ltd 1,600 Proposed<br />
Uttar Pradesh Panki Thermal Power Station extension UP Rajya Vidyut Nigam Ltd 250 Proposed<br />
Uttar Pradesh Parichha Power Station Uttar Pradesh Rajya Vidyut 500 Construction<br />
Uttar Pradesh Rihand III Power Station Unit 5 NTPC 500 Construction<br />
Uttar Pradesh Rihand III Power Station Unit 6 NTPC 500 Construction<br />
Uttar Pradesh Rosa Phase II Power Station (Unit 4) Reliance Power 300 Construction<br />
STATUS<br />
Uttar Pradesh Singrauli Super Thermal Power Station Stage III NTPC 500 Proposed<br />
continued next page<br />
WORKING PAPER | November 2012 | 55