GLObAL COAL RISK ASSESSmENT - World Resources Institute
GLObAL COAL RISK ASSESSmENT - World Resources Institute
GLObAL COAL RISK ASSESSmENT - World Resources Institute
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table A.9 | Proposed Coal-Fired Plants in Southeast Asia and South Asia (except India) (continued)<br />
COUNTRY LOCATION PLANT DEVELOPER<br />
Malaysia 15 Sarawak balingian Coal-Fired<br />
Power Plant<br />
Laos 16 Unknown Laos hongsa Coal Fired<br />
Power Plant<br />
ENDNOTES FOR TAbLE A.9<br />
1. http://pvc.vn/vn/cong-trinh-du-an/xay-dung-cong-nghiep/Nha-maynhiet-dien-Long-Phu-I.aspx.<br />
2. www.vinacomin.vn/en/area/Power-Industry/Signing-ceremony-of-the-<br />
The-No2-Package-of-planning-investment-in-Quynh-Lap-Thermalpower-Plant-construction-Project-2.html.<br />
3. www.powerengineeringint.com/articles/2011/07/tcc-agrees-1bn-dealon-600-mw-subic-bay-project.html.<br />
4. www.sourcewatch.org/index.php?title=Cambodia_and_coal.<br />
5. Ibid.<br />
6. Ibid.<br />
7. http://cambodianewstoday.blogspot.com/2012/02/cambodian-pmgives-green-light-for-coal.html.<br />
8. http://ki-media.blogspot.com/2011/06/land-grabber-lao-meng-khinscoal-fired.html.<br />
9. Energy and mineral <strong>Resources</strong> ministry Regulation No 2 year 2010<br />
and mP3EI (master Plan Economic Development Acceleration and<br />
Extensification of Indonesia, 2011).<br />
68 |<br />
China National Electric Engineering Co.,<br />
Ltd.<br />
CAPACITY<br />
(MW)<br />
600 Under<br />
Environmental<br />
Impact Assessment<br />
1,878 Under construction,<br />
to be completed in<br />
2015<br />
Laos17 Unknown Unknown Far East holding Group Co., Ltd Unknown Unknown<br />
Thailand18 Unknown Unknown National Power Supply (NPS) 540 Unknown<br />
Pakistan19 Thar Coalfields in Sindh Phase I and Phase II Sindh government and Engro Power Gen 5,200 Unknown<br />
Pakistan20 Unknown Converting bin Qasim The Karachi Electric Supply Company 1,260 The second phase<br />
Power Plant into a (KESC) and bright Eagle Enterprises<br />
of the feasibility<br />
coal-fired generation (bEE), a hong Kong-based investment<br />
study is underway<br />
plant<br />
company sponsored by Chinese and<br />
Korean investors<br />
Sri Lanka21 Sampur, Trincomalee district of Unknown National Thermal Power Corporation<br />
500 Construction will<br />
Eastern Province<br />
(NTPC) of India and Ceylon Electricity<br />
board<br />
begin in 2012<br />
Total 65,267<br />
STATUS<br />
10. www.sourcewatch.org/index.php?title=burma_and_coal.<br />
11. Ibid.<br />
12. Ibid.<br />
13. www.mizzima.com/news/inside-burma/6379-coal-power-plant-indawei-cancelled.html.<br />
14. www.sourcewatch.org/index.php?title=Thailand_and_coal.<br />
15. www.doe.gov.my/portal/wp-content/uploads/Executive-Summary3.pdf.<br />
16. www.nepc.com.cn/en/news_view.asp?id=31.<br />
17. www.fegroup.com.cn/newsInfo.asp?ID=5052.<br />
18. www.erc.or.th/ERCWeb2/default.aspx.<br />
19. www.sourcewatch.org/index.php?title=Pakistan_and_coal.<br />
20. www.thenews.com.pk/Todays-News-4-93584-KESC-inks-deal-to-runplant-on-coal.<br />
21. www.powerengineeringint.com/articles/2011/08/agreement-reachedon-sampur-coal-plants.html.