08.04.2013 Views

GLObAL COAL RISK ASSESSmENT - World Resources Institute

GLObAL COAL RISK ASSESSmENT - World Resources Institute

GLObAL COAL RISK ASSESSmENT - World Resources Institute

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A.9 | Proposed Coal-Fired Plants in Southeast Asia and South Asia (except India) (continued)<br />

COUNTRY LOCATION PLANT DEVELOPER<br />

Malaysia 15 Sarawak balingian Coal-Fired<br />

Power Plant<br />

Laos 16 Unknown Laos hongsa Coal Fired<br />

Power Plant<br />

ENDNOTES FOR TAbLE A.9<br />

1. http://pvc.vn/vn/cong-trinh-du-an/xay-dung-cong-nghiep/Nha-maynhiet-dien-Long-Phu-I.aspx.<br />

2. www.vinacomin.vn/en/area/Power-Industry/Signing-ceremony-of-the-<br />

The-No2-Package-of-planning-investment-in-Quynh-Lap-Thermalpower-Plant-construction-Project-2.html.<br />

3. www.powerengineeringint.com/articles/2011/07/tcc-agrees-1bn-dealon-600-mw-subic-bay-project.html.<br />

4. www.sourcewatch.org/index.php?title=Cambodia_and_coal.<br />

5. Ibid.<br />

6. Ibid.<br />

7. http://cambodianewstoday.blogspot.com/2012/02/cambodian-pmgives-green-light-for-coal.html.<br />

8. http://ki-media.blogspot.com/2011/06/land-grabber-lao-meng-khinscoal-fired.html.<br />

9. Energy and mineral <strong>Resources</strong> ministry Regulation No 2 year 2010<br />

and mP3EI (master Plan Economic Development Acceleration and<br />

Extensification of Indonesia, 2011).<br />

68 |<br />

China National Electric Engineering Co.,<br />

Ltd.<br />

CAPACITY<br />

(MW)<br />

600 Under<br />

Environmental<br />

Impact Assessment<br />

1,878 Under construction,<br />

to be completed in<br />

2015<br />

Laos17 Unknown Unknown Far East holding Group Co., Ltd Unknown Unknown<br />

Thailand18 Unknown Unknown National Power Supply (NPS) 540 Unknown<br />

Pakistan19 Thar Coalfields in Sindh Phase I and Phase II Sindh government and Engro Power Gen 5,200 Unknown<br />

Pakistan20 Unknown Converting bin Qasim The Karachi Electric Supply Company 1,260 The second phase<br />

Power Plant into a (KESC) and bright Eagle Enterprises<br />

of the feasibility<br />

coal-fired generation (bEE), a hong Kong-based investment<br />

study is underway<br />

plant<br />

company sponsored by Chinese and<br />

Korean investors<br />

Sri Lanka21 Sampur, Trincomalee district of Unknown National Thermal Power Corporation<br />

500 Construction will<br />

Eastern Province<br />

(NTPC) of India and Ceylon Electricity<br />

board<br />

begin in 2012<br />

Total 65,267<br />

STATUS<br />

10. www.sourcewatch.org/index.php?title=burma_and_coal.<br />

11. Ibid.<br />

12. Ibid.<br />

13. www.mizzima.com/news/inside-burma/6379-coal-power-plant-indawei-cancelled.html.<br />

14. www.sourcewatch.org/index.php?title=Thailand_and_coal.<br />

15. www.doe.gov.my/portal/wp-content/uploads/Executive-Summary3.pdf.<br />

16. www.nepc.com.cn/en/news_view.asp?id=31.<br />

17. www.fegroup.com.cn/newsInfo.asp?ID=5052.<br />

18. www.erc.or.th/ERCWeb2/default.aspx.<br />

19. www.sourcewatch.org/index.php?title=Pakistan_and_coal.<br />

20. www.thenews.com.pk/Todays-News-4-93584-KESC-inks-deal-to-runplant-on-coal.<br />

21. www.powerengineeringint.com/articles/2011/08/agreement-reachedon-sampur-coal-plants.html.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!