Table A.1 | Proposed Coal-Fired Power Plants in China (continued)<br />

PROVINCE PLANT DEVELOPER<br />

CAPACITY<br />

(MW)<br />

Shanxi 325 Gucheng Power Plant Shanxi International Energy 2,000 Permitting<br />

Global Coal Risk Assessment<br />

Shanxi 326 hepo Power Plant Shanxi International Energy 600 Tendering, Permitting<br />

Shanxi 327 Dongshan mine Power Plant Unit 1&2 Shanxi Intl Elec Group Co. 700 Planning<br />

Sichuan328 Guangyuan Power Plant Datang 4,000 NDRC Permitting,<br />

Tendering<br />

Sichuan329 Chengdu Jintang Power Plant Unit 3&4 Guodian 2,000 Permitting<br />

Sichuan330 Gongcxian Power Plant Unit 3&4 huadian 2,000 Planning<br />

Sichuan331 Fukang yongxiang Power Plant Unit 1–5 Sichuan yongxiang Co. 1,750 Planning<br />

Tianjin332 Tianjin Guodian beitang Thermal Power Plant Phase I Guodian and Jinneng Investment 600 mEP and NDRC Permitted<br />

Tianjin333 Tianjin beijiang Power Plant Phase II SDIC and Jinneng Investment 2,000 mEP Permitted<br />

Xinjiang334 huawei hetian City Power Plant Phase II beijing huawei hetian Investment<br />

Ltd. and Zhongmu Co.<br />

600 Planning<br />

Xinjiang335 Jimusaer County Color bay Power Plant Phase I China Power Investment 2,000 Permitting<br />

Xinjiang336 Qitai County Army General Temple Power Plant Phase I China Power Investment 2,000 Permitting<br />

Xinjiang337 Qitai County Jiji Lake Power Plant Phase I China Power Investment 2,000 Permitting<br />

Xinjiang338 CPI And Lu’an Dananhu Power Plant China Power Investment and<br />

Lu’An<br />

1,320 Planning<br />

Xinjiang339 CPI Xinjiang Wujiaqu Power Plant Phase I China Power Investment 1,320 Feasibility Study, Tendering<br />

Xinjiang340 CPI Xinjiang Shanshan Power Plant China Power Investment 700 Permitting<br />

Xinjiang341 hami Dananhu Coal Power Project Datang 2,000 Permitting, Tendering<br />

Xinjiang342 Guodianxukuang Dananhu Power Plant Guodian and Xukuang Co. 2,000 Preparing Construction<br />

Xinjiang343 beitun Power Plant Unit 3&4 Guodian 700 Planning<br />

Xinjiang344 hongyangchi-1 Power Plant Unit 12&13 Guodian 660 Planning<br />

Xinjiang345 Guodian bachu Thermal Power Plant Guodian 700 Feasibility Study and mEP<br />

Permitted<br />

Xinjiang346 hongyanchi-2 Power Plant 5&6 huadian 660 Planning<br />

Xinjiang347 huadian Changji-1 Power Plant Unit 3&4 huadian 250 Planning<br />

Xinjiang348 huaneng heavy Industrial Park Power Plant huaneng 1,320 Planning<br />

Xinjiang349 huaneng Fuhai Thermal Power Plant Phase I huaneng 700 Planning<br />

Xinjiang350 huaneng Turpan Unit 3&4 huaneng 1,200 Planning<br />

Xinjiang351 Xinjiang bingtuan Nongyishi Alaerxinhu Thermal Power<br />

Plant Phase II<br />

Nongyishi Power 700 mEP Permitting<br />

Xinjiang352 SDIC Dananhu Power Plant SDIC 1,320 Planning<br />

Xinjiang353 SDIC yining County Power Project SDIC 660 Planning<br />

Xinjiang354 State Grid Energy Dananhu Power Plant State Grid Energy Development<br />

Co.<br />

2,000 Planning<br />

Xinjiang355 beisantai Ind Park Power Plant Unit 1&2 Wintime Energy Co. 300 Planning<br />

Xinjiang356 Xinjiang Kuche Ehuobulake Coal mine Power Plant Xukuang Co. 1,320 Feasibility Study Permitted<br />

Xinjiang357 Akesu Power Plant Phase II Xuzhou mining Group Co. 1,320 Planning<br />

Yunnan358 Diandong yuwang Power Plant Phase II Unit 3&4 huaneng 1,200 Planning<br />

Zhejiang359 huarun Cangnan Power Plant Phase I China <strong>Resources</strong> holdings 2,000 NDRC Permitted, Tendering<br />