Table A.1 | Proposed Coal-Fired Power Plants in China (continued)<br />
PROVINCE PLANT DEVELOPER<br />
CAPACITY<br />
(MW)<br />
Shanxi 325 Gucheng Power Plant Shanxi International Energy 2,000 Permitting<br />
Global Coal Risk Assessment<br />
Shanxi 326 hepo Power Plant Shanxi International Energy 600 Tendering, Permitting<br />
Shanxi 327 Dongshan mine Power Plant Unit 1&2 Shanxi Intl Elec Group Co. 700 Planning<br />
Sichuan328 Guangyuan Power Plant Datang 4,000 NDRC Permitting,<br />
Tendering<br />
Sichuan329 Chengdu Jintang Power Plant Unit 3&4 Guodian 2,000 Permitting<br />
Sichuan330 Gongcxian Power Plant Unit 3&4 huadian 2,000 Planning<br />
Sichuan331 Fukang yongxiang Power Plant Unit 1–5 Sichuan yongxiang Co. 1,750 Planning<br />
Tianjin332 Tianjin Guodian beitang Thermal Power Plant Phase I Guodian and Jinneng Investment 600 mEP and NDRC Permitted<br />
Tianjin333 Tianjin beijiang Power Plant Phase II SDIC and Jinneng Investment 2,000 mEP Permitted<br />
Xinjiang334 huawei hetian City Power Plant Phase II beijing huawei hetian Investment<br />
Ltd. and Zhongmu Co.<br />
600 Planning<br />
Xinjiang335 Jimusaer County Color bay Power Plant Phase I China Power Investment 2,000 Permitting<br />
Xinjiang336 Qitai County Army General Temple Power Plant Phase I China Power Investment 2,000 Permitting<br />
Xinjiang337 Qitai County Jiji Lake Power Plant Phase I China Power Investment 2,000 Permitting<br />
Xinjiang338 CPI And Lu’an Dananhu Power Plant China Power Investment and<br />
Lu’An<br />
1,320 Planning<br />
Xinjiang339 CPI Xinjiang Wujiaqu Power Plant Phase I China Power Investment 1,320 Feasibility Study, Tendering<br />
Xinjiang340 CPI Xinjiang Shanshan Power Plant China Power Investment 700 Permitting<br />
Xinjiang341 hami Dananhu Coal Power Project Datang 2,000 Permitting, Tendering<br />
Xinjiang342 Guodianxukuang Dananhu Power Plant Guodian and Xukuang Co. 2,000 Preparing Construction<br />
Xinjiang343 beitun Power Plant Unit 3&4 Guodian 700 Planning<br />
Xinjiang344 hongyangchi-1 Power Plant Unit 12&13 Guodian 660 Planning<br />
Xinjiang345 Guodian bachu Thermal Power Plant Guodian 700 Feasibility Study and mEP<br />
Permitted<br />
Xinjiang346 hongyanchi-2 Power Plant 5&6 huadian 660 Planning<br />
Xinjiang347 huadian Changji-1 Power Plant Unit 3&4 huadian 250 Planning<br />
Xinjiang348 huaneng heavy Industrial Park Power Plant huaneng 1,320 Planning<br />
Xinjiang349 huaneng Fuhai Thermal Power Plant Phase I huaneng 700 Planning<br />
Xinjiang350 huaneng Turpan Unit 3&4 huaneng 1,200 Planning<br />
Xinjiang351 Xinjiang bingtuan Nongyishi Alaerxinhu Thermal Power<br />
Plant Phase II<br />
Nongyishi Power 700 mEP Permitting<br />
Xinjiang352 SDIC Dananhu Power Plant SDIC 1,320 Planning<br />
Xinjiang353 SDIC yining County Power Project SDIC 660 Planning<br />
Xinjiang354 State Grid Energy Dananhu Power Plant State Grid Energy Development<br />
Co.<br />
2,000 Planning<br />
Xinjiang355 beisantai Ind Park Power Plant Unit 1&2 Wintime Energy Co. 300 Planning<br />
Xinjiang356 Xinjiang Kuche Ehuobulake Coal mine Power Plant Xukuang Co. 1,320 Feasibility Study Permitted<br />
Xinjiang357 Akesu Power Plant Phase II Xuzhou mining Group Co. 1,320 Planning<br />
Yunnan358 Diandong yuwang Power Plant Phase II Unit 3&4 huaneng 1,200 Planning<br />
Zhejiang359 huarun Cangnan Power Plant Phase I China <strong>Resources</strong> holdings 2,000 NDRC Permitted, Tendering<br />