Table A.11 | Proposed Coal-Fired Plants in Africa<br />

COUNTRY LOCATION PLANT DEVELOPER<br />

South Africa Witbank Khanyisa Coal Fired<br />

power Station<br />

South Africa Witbank/Delmas FbC KiPower and Kuyusa<br />

mining<br />

70 |<br />

CAPACITY<br />

(MW)<br />

STATUS<br />

Anglo American 450 Final Environmental Impact Assessment<br />

underway. Possible part of the Integrated<br />

Resource Plan (IRP) for electricity<br />

600 Just starting Environmental Impact<br />

Assessment process. Possible part of IRP<br />

South Africa Unknown Coal 3 Eskom 4,800 Not currently in energy planning (IRP).<br />

SA 2012 budget mentioned possibility,<br />

indicated ZAR 200bn price tag<br />

South Africa Unknown IRP Planned Coal Fire Unknown 6,250 To be completed in 2030, starting in 2014<br />

South Africa Witbank, Vaal IRP RTS Camden,<br />

Grootvlei, Komati<br />

Eskom 1,463 To be completed in 2013, started in 2010<br />

South Africa Waterberg medupi Eskom 4,332 To be completed in 2017, starting in 2013.<br />

New, part of IRP<br />

South Africa Delmas Kusile Eskom 4,338 To be completed in 2020, starting in 2017.<br />

New, part of IRP<br />

South Africa1 majuba majuba Power Station<br />

UCG demonstration plant<br />

Eskom 100-400 To be completed in 2015, started in 2011<br />

Mozambique<br />

Mozambique<br />

Unknown moatize Power Plant Vale 600 To be completed in 2015. Studies under<br />

way for 2000mW<br />

Unknown benga Power Plant Riversdale 600 To be completed in 2015. Studies under<br />

way for 2000mW<br />

Mozambique Unknown mozambique backbone Cesul 3,100 To be completed in 2017<br />

Mozambique Tete Thermal Coal Jindal Steel & Power 2,640 Inital studies only<br />

Botswana2 Unknown morupule Power Station<br />

Expansion morupule b<br />

Botswana3 Unknown mmamabula Export Power<br />

project<br />

Botswana 4 Near the mmamabula<br />

coal field<br />

mookane Domestic Power<br />

Project (mDPP)<br />

botswana Power<br />

Corporation (bPC)<br />

CIC Energy and Vitol 1,200 Not started<br />

CIC Energy, Golden<br />

Concord holdings<br />

Limited (GCL)<br />

300 Under construction, to be completed in<br />

June, 2015<br />

300 Unknown<br />

Botswana5 may be anywhere Unknown Unknown 300 botswana Power Corporation to open up for<br />

tenders end of 2012, due by 2018/2019<br />

Zimbabwe6 In the Lusulu coal<br />

fields at binga, in the<br />

matabeleland North<br />

province of Zimbabwe<br />

Unknown Unknown 2,000 To be completed in 2016<br />

Morocco7 Safi Safi power station Electricité de France 1,320 Unknown<br />

Morocco8 Jorf Lasfar Jorf Lasfar coal fired<br />

power plant unit 5 unit 6<br />

Jorf Lasfar Energy 1,356 To be completed in 2013<br />

Tanzania9 Near mbalawala mine Unknown Australia’s Intra Energy<br />

Corporation (IEC)<br />

120 Unknown<br />

Tanzania10 mbeya Unknown Australia’s Intra Energy<br />

Corporation (IEC)<br />

400 between 2013 to 2018<br />

continued next page