20.05.2013 Views

Operating Manual - SCHNIER Elektrostatik GmbH

Operating Manual - SCHNIER Elektrostatik GmbH

Operating Manual - SCHNIER Elektrostatik GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7. Functional Description<br />

7.1. General<br />

The high voltage generator is built as a compact design. The control, power amplifier,<br />

the transformer and the HV multiplier are combined in one device. Supply Voltage is<br />

24 V DC. The built-in microcontroller provides a very accurate and fast control of the<br />

HV output.<br />

7.2. Safety<br />

The voltage (U) at the HV connector is measured permanently even after switching off<br />

the high voltage. With a given capacity (C) one can calculate the discharging energy<br />

(E) that remains in the spraying system and the high voltage supply system:<br />

E=1/2C* U 2<br />

E: remaining discharging energy after switch off in Joule<br />

C: total capacity of the whole HV supply system in Farad<br />

U: Voltage level in Volt<br />

Factory preset for the calculation by the HV generator is 3nF. This value can be<br />

changed via CAN bus to the actual capacity of the installation (not yet implemented).<br />

Based on the limit of 0.24mJ (EN 50176,50177,50223) for the discharge energy to be<br />

safe the hv generator sets the bit “high voltage is off safely” in the status word if E is<br />

below this limit. Otherwise the bit is reset. For 3nF and 0.24mJ the voltage limit is about<br />

400V.<br />

WARNING<br />

If a Generator has to be removed for repair –<br />

especially after the occurence of failures of selftests –<br />

Observe Section 6 of this manual.<br />

<strong>Operating</strong> Instructions 810364_BAL_EN120302 Stand 02.03.2012 Seite 14 von 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!