Operating Manual - SCHNIER Elektrostatik GmbH
Operating Manual - SCHNIER Elektrostatik GmbH
Operating Manual - SCHNIER Elektrostatik GmbH
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3. Intended Use<br />
This Product is dedicated for the use in stationary installations which comply with the<br />
safety requirements of at least one of this harmonized standards:<br />
EN 50176:2009,<br />
EN 50177:2009,<br />
EN 50223:2010 or<br />
EN 50348 :2010<br />
This high voltage generator is classified as category 3G and/or 3D equipment for use in<br />
Zone 2 and/or Zone 22 in potentially explosive atmospheres.<br />
Permitted is only the use in potentially explosive atmospheres which are caused by the<br />
spray cloud of the processed coating material itself.<br />
WARNING<br />
any other or extended use is strictly prohibited and lead to a potentially<br />
hazardous situation which could result in death or injury<br />
This device must not be used stand-alone. It has to be fully installed in stationary<br />
equipment that complies in total with the product standards mentioned above.<br />
3.1.Further Requirements for the Stationary Equipment<br />
This HV-generator must be used only in electrostatic units within a temperature<br />
range of 15 °C to 40 °C and a relative humidity between 10%<br />
and 70%.(non-condensing)<br />
This HV-generator is intended for incorporation in a given fixed<br />
installation in industrial environments. There may be difficulties to ensure<br />
electromagnetic compability (EMC) in other environments.<br />
To avoid potentially hazardous situations it is necessary to do a risk analysis<br />
of the installation in total. Particularly with regard to safety categories<br />
and/or performance levels stated in the relevant product standards this is<br />
mandatory*<br />
* Since the spray system is connected via a high voltage cable to the high voltage generator,<br />
a performance level cannot be ensured by the high voltage generator alone. For<br />
this, a second high voltage cable from the spray system returned to a redundant measurement<br />
path in the high voltage generator would be necessary.<br />
<strong>Operating</strong> Instructions 810364_BAL_EN120302 Stand 02.03.2012 Seite 5 von 25