A grid system was established along <strong>the</strong> curbs and <strong>the</strong> building, and <strong>the</strong><br />

surface of <strong>the</strong> yard was surveyed periodically to control elevation<br />

requirements. Surveying was performed after excavation, subgrade<br />

preparation, and backfilling. Excess material over that required to grade<br />

<strong>the</strong> site was stockpiled on <strong>the</strong> surface of <strong>the</strong> drum yard. This stockpiled<br />

material was loaded into trucks during removal of residential soils and in<br />

accordance with <strong>the</strong> procedures presented in Section 2.5 of <strong>the</strong> Work Plan.<br />

Drums containing drill cuttings, which had been transferred from <strong>the</strong> drum<br />

yard to <strong>the</strong> building, were brought back out to <strong>the</strong> stockpile, opened and<br />

dumped into <strong>the</strong> pile. The emptied drums were <strong>the</strong>n carried back into <strong>the</strong><br />

building. The emptied contents were disposed with <strong>the</strong> residential soils.<br />

2.2.4.2 Drainaqe Ditch Excavation<br />

Excavation of <strong>the</strong> drainage ditch areas conformed to Section 2200, and to<br />

<strong>the</strong> As-built Construction Drawings in Appendix A of this implementation<br />

report. The position of <strong>the</strong> ditch along Thomas Street was altered slightly<br />

to accommodate two monitoring wells. This excavation was performed with<br />

<strong>the</strong> backhoe and dozer. Grade was checked and controlled by periodic<br />

surveying.<br />

All materials excavated in <strong>the</strong> drainage ditch area were stockpiled for<br />

disposal along with <strong>the</strong> residential soils. Use of hand tools and labor was<br />

required to protect utilities during construction.<br />

2.2.4.3 Eouipment Decontamination<br />

Equipment used during Phase I work was decontaminated when this equipment<br />

was required to cross between contaminated areas and noncontaminated areas,<br />

and when site grading operations were completed.<br />

The decontamination was performed by placing plastic in an area between <strong>the</strong><br />

contaminated area and <strong>the</strong> noncontaminated area. The equipment was <strong>the</strong>n<br />

driven slowly onto <strong>the</strong> plastic, steam cleaned, and <strong>the</strong>n driven slowly onto<br />

<strong>the</strong> noncontaminated area. The steam cleaning water was allowed to drain