1 - the Envirostor
1 - the Envirostor
1 - the Envirostor
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4.1 Introduction<br />
4.0 SITE AND COMMUNITY HEALTH AND SAFETY<br />
The work performed in implementing <strong>the</strong> Health and Safety Plan was designed<br />
as a practical approach to accomplishing <strong>the</strong> ERA activities considering <strong>the</strong><br />
occupational and public health hazards anticipated at <strong>the</strong> site. The Health<br />
and Safety procedures applied to all site activities carried out under <strong>the</strong><br />
Expedited Response Action (ERA) at <strong>the</strong> BAD site.<br />
All on-si te personnel, enforcement agency personnel, and visitors were<br />
required to familiarize <strong>the</strong>mselves with and comply with provisions of <strong>the</strong><br />
Health and Safety Plan. Canonie provided health and safety equipment for<br />
Canonie employees and subcontractors. All o<strong>the</strong>r personnel provided equal<br />
or greater levels of protection for <strong>the</strong>mselves.<br />
4.2 Revisions to <strong>the</strong> Health and Safety Plan<br />
Because conditions varied, <strong>the</strong> original plan presented in Section 4.0 of<br />
<strong>the</strong> work plan was upgraded and downgraded, as appropriate, depending on<br />
site conditions. All changes to <strong>the</strong> Health and Safety Plan were determined<br />
or approved by <strong>the</strong> site Health and Safety Officer and discussed with <strong>the</strong><br />
Project Officer.<br />
4.3 Kev Personnel and Their Res~onsi bil ities<br />
The following list names <strong>the</strong> key personnel who were assigned to <strong>the</strong> project<br />
for implementation of <strong>the</strong> ERA. Details of <strong>the</strong>ir experience and technical<br />
levels were provided in Appendix C of <strong>the</strong> work plan. Additional personnel<br />
required to implement <strong>the</strong> ERA were determined after approval of <strong>the</strong> work<br />
plan and pricing proposal and before performance of <strong>the</strong> work required by<br />
such personnel.