ox marked "nonhazardous materials" (prepared according to Section 2.2.3).<br />

Any materials that were stained or o<strong>the</strong>rwise considered hazardous were<br />

separated from nonhazardous materials and loaded into roll-off boxes marked<br />

as "hazardous materials. " Table 2 provides a summary of <strong>the</strong> hazardous<br />

materials which were transported off-site.<br />

Trees and shrubs were cut flush with <strong>the</strong> ground surface, loaded into <strong>the</strong><br />

loader bucket, and placed into <strong>the</strong> nonhazardous roll -off boxes. All<br />

personnel performed <strong>the</strong> demo1 i tion work under levels of protection required<br />

by Section 4.7. Before performing any activities during debris removal and<br />

excavation operations, <strong>the</strong> surface of <strong>the</strong> ground was moistened to reduce<br />

creation of and exposure to dust.<br />

2.4.2 Surface Preoaration<br />

After demolition operations, a three-inch lift of fill material was placed<br />

by Canonie and graded by Esquivel Grading and Paving over <strong>the</strong> drum yard<br />

surface. The material was placed to provide a clean surface for operation<br />

of equipment and personnel. An additional thickness of fill was placed as<br />

required to produce a level surface for operation of excavation equipment.<br />

The cover material was dumped in <strong>the</strong> vacant lot and spread by <strong>the</strong> bulldozer<br />

until <strong>the</strong> required thickness and a level surface were achieved. The<br />

surface of <strong>the</strong> fill was compacted only as necessary to allow operation of<br />

equipment over <strong>the</strong> surface.<br />

2.5 Soil Excavation and Backfill Placement<br />

2.5.1 Site Clearinq and Gradinq<br />

Site clearing and grading was performed before excavation ofdesignated<br />

soils with procedures similar to those outlined in Section 2.2. This work<br />

was performed using equipment and personnel as presented in Section 5.0 of<br />

<strong>the</strong> Work Plan or as shown in <strong>the</strong> project financial reports.