2.2.4.6 Preoaration of Roll-Off Boxes<br />
The roll-off boxes were lined with 5-mil thick plastic sheets before<br />
placement of any waste materi a1 s.<br />
2.3 Removal of Liauids and Sludqes<br />
To expedite <strong>the</strong> removal process, samples of <strong>the</strong> liquid and sludge materials<br />
for <strong>the</strong> on-site tanks and <strong>the</strong> sump were obtained before implementation of<br />
<strong>the</strong> work plan. The samples were obtained and tested for compatibility and<br />
chemical content. Chemical compatibility testing conformed to <strong>the</strong> testing<br />
requirements as outlined in Section 2.10. Chemical content testing was<br />
performed as required for <strong>the</strong> determination of <strong>the</strong> disposal profile and for<br />
acceptance by <strong>the</strong> Kettleman Hills disposal facility. The results of <strong>the</strong>se<br />
tests are provided in Appendix C.<br />
2.3.1 Sludae Tank<br />
The liquids were removed from <strong>the</strong> sludge tank by being pumped into 55-<br />
gallon drums. After pumping, solids and sludges were removed and placed<br />
into 55-gallon drums using <strong>the</strong> Case 580 backhoe with a twelve-inch bucket.<br />
The outside surface of <strong>the</strong> 55-gallon drums were shea<strong>the</strong>d in plastic so that<br />
this surface would be kept clean. The drums were placed in a berm<br />
constructed of plastic sheeting and absorbant in case spillage occurred.<br />
Residual sol ids were removed by hand excavations. After cleaning, <strong>the</strong> tank<br />
was loaded with yard debris, placed on a flatbed truck, and transported to<br />
<strong>the</strong> Kettleman Hills disposal facility. The tank was picked up by a crane<br />
with steel cables wrapped around each end of <strong>the</strong> tank and connected in <strong>the</strong><br />
middle. The cables were <strong>the</strong>n secured to <strong>the</strong> lifting arm of <strong>the</strong> crane and<br />
<strong>the</strong> tank was lifted onto <strong>the</strong> truck.<br />
2.3.2 Boiler Tank<br />
The 1 iquid from <strong>the</strong> boiler tank was collected into 55-gallon drums. The<br />
liquid was drained through a valve at <strong>the</strong> bottom of <strong>the</strong> tank and into 5-