2.2.4.6 Preoaration of Roll-Off Boxes<br />

The roll-off boxes were lined with 5-mil thick plastic sheets before<br />

placement of any waste materi a1 s.<br />

2.3 Removal of Liauids and Sludqes<br />

To expedite <strong>the</strong> removal process, samples of <strong>the</strong> liquid and sludge materials<br />

for <strong>the</strong> on-site tanks and <strong>the</strong> sump were obtained before implementation of<br />

<strong>the</strong> work plan. The samples were obtained and tested for compatibility and<br />

chemical content. Chemical compatibility testing conformed to <strong>the</strong> testing<br />

requirements as outlined in Section 2.10. Chemical content testing was<br />

performed as required for <strong>the</strong> determination of <strong>the</strong> disposal profile and for<br />

acceptance by <strong>the</strong> Kettleman Hills disposal facility. The results of <strong>the</strong>se<br />

tests are provided in Appendix C.<br />

2.3.1 Sludae Tank<br />

The liquids were removed from <strong>the</strong> sludge tank by being pumped into 55-<br />

gallon drums. After pumping, solids and sludges were removed and placed<br />

into 55-gallon drums using <strong>the</strong> Case 580 backhoe with a twelve-inch bucket.<br />

The outside surface of <strong>the</strong> 55-gallon drums were shea<strong>the</strong>d in plastic so that<br />

this surface would be kept clean. The drums were placed in a berm<br />

constructed of plastic sheeting and absorbant in case spillage occurred.<br />

Residual sol ids were removed by hand excavations. After cleaning, <strong>the</strong> tank<br />

was loaded with yard debris, placed on a flatbed truck, and transported to<br />

<strong>the</strong> Kettleman Hills disposal facility. The tank was picked up by a crane<br />

with steel cables wrapped around each end of <strong>the</strong> tank and connected in <strong>the</strong><br />

middle. The cables were <strong>the</strong>n secured to <strong>the</strong> lifting arm of <strong>the</strong> crane and<br />

<strong>the</strong> tank was lifted onto <strong>the</strong> truck.<br />

2.3.2 Boiler Tank<br />

The 1 iquid from <strong>the</strong> boiler tank was collected into 55-gallon drums. The<br />

liquid was drained through a valve at <strong>the</strong> bottom of <strong>the</strong> tank and into 5-