Drawings - Peak Engineering and Construction Ltd
Drawings - Peak Engineering and Construction Ltd
Drawings - Peak Engineering and Construction Ltd
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A<br />
B<br />
C<br />
D<br />
REFER TO<br />
NOTE 2<br />
BLOWER AIR<br />
1 2 3 4 5 6<br />
(NO INSULATION<br />
REQUIRED)<br />
DRILL 300 DIA BLIND FLG<br />
FOR 75 DIA AIR VALVE<br />
CONNECTION<br />
75 DIA GATE VALVE<br />
100X75 REDUCER<br />
100 DIA NIPPLE<br />
300X300 TEE FOR<br />
FUTURE FILTERS<br />
150 DIA VENT<br />
4<br />
11<br />
10<br />
CONCRETE SUPPORT<br />
PIPE SUPPORT<br />
TOP OF CURB<br />
300 DIA VENT<br />
5 5<br />
250 DIA BLIND<br />
FLANGE<br />
2 SECTION<br />
1:30<br />
000-D-2004<br />
REFER TO<br />
NOTE 2<br />
BLOWER AIR<br />
(NO INSULATION<br />
REQUIRED)<br />
UNDERDRAINS<br />
(AWI PHOENIX<br />
LATERALS)<br />
REFER TO<br />
NOTE 2<br />
TOP OF CURB<br />
4 SECTION<br />
1:30<br />
000-D-2004<br />
5<br />
13 MM POTABLE WATER<br />
REFRESH LINE C/W<br />
SOLENOID VALVE WITH<br />
MANUAL BY-PASS VALVES<br />
300 DIA VENT<br />
400X300<br />
REDUCER<br />
400 DIA<br />
FLANGE<br />
450X200<br />
REDUCER<br />
10<br />
6<br />
REFER TO<br />
NOTE 2<br />
6<br />
3 SECTION<br />
1:30<br />
000-D-2004<br />
REFER TO<br />
NOTE 2<br />
7<br />
PIPE SUPPORT<br />
NOTES:<br />
250X200<br />
REDUCER<br />
FUTURE 150 DIA<br />
FILTER-TO-WASTE<br />
11<br />
10<br />
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS TO FAMILIARIZE<br />
THEMSELVES WITH THE SCOPE OF WORK PRIOR TO PROCEEDING.<br />
SOME PIPING AND EQUIPMENT HAS BEEN OMITTED FOR CLARITY.<br />
2. INSULATE ALL PIPE GALLERY PIPES. PROVIDE REMOVABLE INSULATION<br />
SECURED WITH VELCRO ADHESIVE AROUND VALVES, EQUIPMENT<br />
(EXCLUDING PUMPS AND AIR/VACUUM RELIEF VALVES), INJECTION POINTS<br />
ETC. PER SECTION 15080. CLEAN AND PASSIVATE STAINLESS STEEL PIPING<br />
WHERE REQUIRED BEFORE INSULATING.<br />
DATE<br />
PROJ<br />
SHEET<br />
VERIFY SCALE<br />
FILENAME: 000-D-2005_424251.dgn PLOT DATE: 2012\07\25 PLOT TIME: 5:49:28 PM<br />
DISTRICT M UNICIPALITY<br />
DWG<br />
OF M USKOKA<br />
FAIRYVIEW W ATER TREATMENT PLANT<br />
PROCESS MECHANICAL<br />
MB<br />
JPN<br />
ISSUED FOR TENDER<br />
07/2012<br />
0<br />
PHASE I UPGRADES<br />
BAR IS 25mm ON<br />
APVD<br />
BY<br />
REVISION<br />
DATE<br />
NO.<br />
CONTRACT 12-432-253<br />
PIPE GALLERY INSULATION<br />
SECTIONS<br />
ORIGINAL DRAWING.<br />
0 25 MM<br />
APVD<br />
CHK<br />
DSGN DR<br />
12of62<br />
ET JPN<br />
JPN RC<br />
2012/07/27<br />
424251<br />
000-D-2005<br />
CH2M HILL 2012. ALL RIGHTS RESERVED.<br />
c<br />
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />
CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />
REUSE OF DOCUMENTS:<br />
ISSUED FOR TENDER