02.06.2013 Views

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A<br />

B<br />

C<br />

D<br />

REFER TO<br />

NOTE 2<br />

BLOWER AIR<br />

1 2 3 4 5 6<br />

(NO INSULATION<br />

REQUIRED)<br />

DRILL 300 DIA BLIND FLG<br />

FOR 75 DIA AIR VALVE<br />

CONNECTION<br />

75 DIA GATE VALVE<br />

100X75 REDUCER<br />

100 DIA NIPPLE<br />

300X300 TEE FOR<br />

FUTURE FILTERS<br />

150 DIA VENT<br />

4<br />

11<br />

10<br />

CONCRETE SUPPORT<br />

PIPE SUPPORT<br />

TOP OF CURB<br />

300 DIA VENT<br />

5 5<br />

250 DIA BLIND<br />

FLANGE<br />

2 SECTION<br />

1:30<br />

000-D-2004<br />

REFER TO<br />

NOTE 2<br />

BLOWER AIR<br />

(NO INSULATION<br />

REQUIRED)<br />

UNDERDRAINS<br />

(AWI PHOENIX<br />

LATERALS)<br />

REFER TO<br />

NOTE 2<br />

TOP OF CURB<br />

4 SECTION<br />

1:30<br />

000-D-2004<br />

5<br />

13 MM POTABLE WATER<br />

REFRESH LINE C/W<br />

SOLENOID VALVE WITH<br />

MANUAL BY-PASS VALVES<br />

300 DIA VENT<br />

400X300<br />

REDUCER<br />

400 DIA<br />

FLANGE<br />

450X200<br />

REDUCER<br />

10<br />

6<br />

REFER TO<br />

NOTE 2<br />

6<br />

3 SECTION<br />

1:30<br />

000-D-2004<br />

REFER TO<br />

NOTE 2<br />

7<br />

PIPE SUPPORT<br />

NOTES:<br />

250X200<br />

REDUCER<br />

FUTURE 150 DIA<br />

FILTER-TO-WASTE<br />

11<br />

10<br />

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS TO FAMILIARIZE<br />

THEMSELVES WITH THE SCOPE OF WORK PRIOR TO PROCEEDING.<br />

SOME PIPING AND EQUIPMENT HAS BEEN OMITTED FOR CLARITY.<br />

2. INSULATE ALL PIPE GALLERY PIPES. PROVIDE REMOVABLE INSULATION<br />

SECURED WITH VELCRO ADHESIVE AROUND VALVES, EQUIPMENT<br />

(EXCLUDING PUMPS AND AIR/VACUUM RELIEF VALVES), INJECTION POINTS<br />

ETC. PER SECTION 15080. CLEAN AND PASSIVATE STAINLESS STEEL PIPING<br />

WHERE REQUIRED BEFORE INSULATING.<br />

DATE<br />

PROJ<br />

SHEET<br />

VERIFY SCALE<br />

FILENAME: 000-D-2005_424251.dgn PLOT DATE: 2012\07\25 PLOT TIME: 5:49:28 PM<br />

DISTRICT M UNICIPALITY<br />

DWG<br />

OF M USKOKA<br />

FAIRYVIEW W ATER TREATMENT PLANT<br />

PROCESS MECHANICAL<br />

MB<br />

JPN<br />

ISSUED FOR TENDER<br />

07/2012<br />

0<br />

PHASE I UPGRADES<br />

BAR IS 25mm ON<br />

APVD<br />

BY<br />

REVISION<br />

DATE<br />

NO.<br />

CONTRACT 12-432-253<br />

PIPE GALLERY INSULATION<br />

SECTIONS<br />

ORIGINAL DRAWING.<br />

0 25 MM<br />

APVD<br />

CHK<br />

DSGN DR<br />

12of62<br />

ET JPN<br />

JPN RC<br />

2012/07/27<br />

424251<br />

000-D-2005<br />

CH2M HILL 2012. ALL RIGHTS RESERVED.<br />

c<br />

THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />

CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />

REUSE OF DOCUMENTS:<br />

ISSUED FOR TENDER

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!