02.06.2013 Views

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A<br />

B<br />

C<br />

D<br />

EA<br />

(1650 L/s)<br />

MD-116<br />

EMERGENCY<br />

OPEN<br />

EMERGENCY<br />

PUSH<br />

BUTTON<br />

HS-0054<br />

M<br />

CP-EF-12<br />

CP-EF-101<br />

1 2 3 4 5 6<br />

EF-101<br />

(2-SPEED, VFD<br />

CONTROLLED)<br />

EF-12<br />

NORMAL<br />

VENT<br />

MD-115<br />

M<br />

M<br />

M MD-117<br />

MAU-101 DPS-0051<br />

MD-118 M<br />

(2-SPEED, VFD US-0052<br />

EA<br />

CONTROLLED)<br />

EA<br />

(538/188 L/s)<br />

(350/700 L/s)<br />

T<br />

OSA<br />

(825/1650 L/s)<br />

UH-9<br />

UH-10<br />

UH-18<br />

NATURAL GAS<br />

SUPPLY<br />

T<br />

SA<br />

NTS<br />

TS-0053<br />

SMOKE DETECTOR<br />

ALARM TO SCADA<br />

(825/1650 L/s)<br />

I<br />

CO<br />

RA<br />

(432 L/s)<br />

CP-EF-103<br />

CP-MAU-101<br />

AIS-0056<br />

MECHANICAL<br />

ROOM<br />

M<br />

EF-103<br />

T<br />

SA<br />

+/-<br />

(275/550 L/s)<br />

SA<br />

(275/550 L/s)<br />

SA<br />

(275/550 L/s)<br />

CHEMICAL STORAGE<br />

EA<br />

(432 L/s)<br />

M<br />

MD-106<br />

AIS-0025<br />

-<br />

CO<br />

(350/700 L/s MAX)<br />

OSA<br />

(432L/s)<br />

M MD-108<br />

M<br />

MD-104<br />

CHEMICAL STORAGE AND MECHANICAL ROOM<br />

TA<br />

REFER TO DWG 000-M-0006<br />

FOR ADDITIONAL EQUIPMENT<br />

IN MECHANICAL ROOM<br />

UH-11<br />

EMERGENCY<br />

CLOSE<br />

(2-SPEED, VFD<br />

CONTROLLED)<br />

T<br />

SODA ASH ROOM<br />

EF-102<br />

-<br />

EA<br />

EF-6<br />

(1248 L/s)<br />

BDD<br />

CP-EF-102<br />

M<br />

EMERGENCY<br />

PUSH<br />

BUTTON<br />

HS-0055<br />

OSA<br />

(700 L/s MAX)<br />

MD-6<br />

BUILDING MECHANICAL<br />

MB<br />

LL<br />

07/2012<br />

0<br />

HVAC<br />

AIR FLOW SCHEMATICS<br />

AND CONTROLS (2)<br />

RC<br />

LL<br />

2012/07/27<br />

424251<br />

000-M-0003<br />

FILENAME: 000-M-0003_424251.dgn PLOT DATE: 2012\07\25 PLOT TIME: 6:00:08 PM<br />

DISTRICT M UNICIPALITY<br />

DATE<br />

PROJ<br />

DWG<br />

OF M USKOKA<br />

SHEET<br />

FAIRYVIEW W ATER TREATMENT PLANT<br />

ISSUED FOR TENDER<br />

PHASE I UPGRADES<br />

VERIFY SCALE<br />

BAR IS 25mm ON<br />

APVD<br />

BY<br />

REVISION<br />

DATE<br />

NO.<br />

CONTRACT 12-432-253<br />

ORIGINAL DRAWING.<br />

0 25 MM<br />

APVD<br />

CHK<br />

DSGN DR<br />

23of62<br />

LL<br />

SW<br />

CH2M HILL 2012. ALL RIGHTS RESERVED.<br />

c<br />

THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />

CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />

REUSE OF DOCUMENTS:<br />

ISSUED FOR TENDER

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!