1 2 3 4 5 6<br />

FLOC TANK No. 3<br />

FLOC TANK No. 1<br />

RAPID MIXING<br />

CHAMBER<br />

CHEMICAL PIPING DEMOLITION<br />

1:50<br />

CHAMBER<br />

REMOVE EXISTING 65 PVC<br />

POLYELECTROLYTES PIPE<br />

EXCEPT FOR PORTION IN<br />

SODA ASH<br />

RETENTION<br />

CHAMBER<br />

SODA ASH<br />

RETENTION<br />

CHAMBER<br />

JANITOR ROOM<br />

EXISTING 40 PVC CHLORINE<br />

CHEMICAL<br />

STORAGE<br />

EXISTING WALL BETWEEN SODA<br />

ASH RETENTION CHAMBER AND<br />

JANITOR ROOM. PROVIDE PVC<br />

CAP ON PIPE ON JANITOR ROOM<br />

SIDE OF WALL ONLY. FILL PIPE<br />

COMPLETELY WITH GROUT FLUSH<br />

WITH SODA ASH RETENTION<br />

CHAMBER WALL<br />

REMOVE EXISTING 65 PVC<br />

SODIUM CARBONATE PIPE<br />

EXCEPT FOR PORTION IN<br />

EXISTING WALL BETWEEN SODA<br />

ASH RETENTION CHAMBER AND<br />

JANITOR ROOM. PROVIDE PVC<br />

CAP ON PIPE ON JANITOR ROOM<br />

SIDE OF WALL ONLY. FILL PIPE<br />

COMPLETELY WITH GROUT FLUSH<br />

WITH SODA ASH RETENTION<br />

CHAMBER WALL<br />

EXISTING CONCRETE BLOCK WALL<br />

COVERING CONCRETE TANK WALL<br />

BETWEEN SODA ASH RETENTION<br />

CHAMBER AND JANITOR ROOM<br />

1<br />

PHOTO<br />

2<br />

PHOTO<br />

SODA ASH MIXING CHAMBER<br />

REMOVE EXISTING 65 PVC<br />

SODIUM CARBONATE PIPING<br />

REMOVE EXISTING 65 PVC<br />

PHOTOGRAPH (JANITOR ROOM)<br />

1 NTS<br />

PROVIDE PVC CAP ON PIPE ON ONE SIDE OF EACH WALL ONLY.<br />

CUT PIPE FLUSH WITH OTHER SIDE OF WALL WHEN REMOVING<br />

PIPE SECTIONS. FILL PIPE WITHIN WALL COMPLETELY WITH<br />

NON-SHRINK, NON-FERROUS GROUT FLUSH WITH OTHER SIDE<br />

OF WALL. REFER TO DETAIL ON THIS DRAWING FOR NEW CHEMICAL<br />

PIPING. ALL REPAIRS TO BE WATER TIGHT<br />

POLYELECTROLYTES PIPING<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

EXISTING 40 PVC CHLORINE<br />

EXISTING CONCRETE<br />

TANK WALL<br />

EXISTING CONCRETE<br />

BLOCK WALL<br />

EXISTING 65 PVC POLYELECTROLYTES<br />

PIPING TERMINATES AT THIS POINT<br />

REMOVE EXISTING 65 PVC<br />

SODIUM CARBONATE PIPE<br />

BACK TO SODA ASH ROOM<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

EXISTING 40 PVC CHLORINE EXISTING 40 PVC CHLORINE<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

REFER TO PHOTOGRAPH 2<br />

FOR CONTINUATION AND<br />

PIPE DEMOLITION DETAILS<br />

THROUGH THIS WALL<br />

EXISTING CONCRETE<br />

BLOCK WALL<br />

1 DETAIL<br />

NTS<br />

000-D-2001<br />

EXISTING CONCRETE<br />

TANK WALL<br />

EXISTING CONCRETE<br />

BLOCK WALL<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

REFER TO PHOTOGRAPH 1<br />

FOR CONTINUATION<br />

REMOVE EXISTING 65 PVC<br />

POLYELECTROLYTES PIPE<br />

AND 65 PVC SODIUM<br />

CARBONATE PIPE ON<br />

BOTH SIDES OF WALL<br />

SEPARATING JANITOR ROOM<br />

AND CHEMICAL STORAGE AS<br />

SHOWN. CUT PIPES FLUSH<br />

WITH WALL ON BOTH SIDES<br />

OF WALL. PIPES TO REMAIN<br />

IN WALL AND WILL BE USED<br />

AS SLEEVES FOR 2 NEW<br />

40-LS-PVC PIPES. REFER TO<br />

"NEW CHEMICAL PIPING" ON<br />

THIS DRAWING FOR ADDITIONAL<br />

DETAILS<br />

EXISTING CONCRETE BLOCK<br />

WALL BETWEEN JANITOR ROOM<br />

AND CHEMICAL STORAGE<br />

2 NTS<br />

FLOC TANK No. 3<br />

FLOC TANK No. 1<br />

1:50<br />

CHAMBER<br />

SODA ASH<br />

RETENTION<br />

CHAMBER<br />

FL EL 293.450<br />

RAPID MIXING<br />

CHAMBER<br />

SODA ASH<br />

RETENTION<br />

CHAMBER<br />

FL EL 293.450<br />

JANITOR ROOM<br />

CHEMICAL<br />

STORAGE<br />

FOR CONTINUATION<br />

1<br />

PHOTO<br />

2<br />

PHOTO<br />

50-CDS-PVC PIPES FROM CO2 PANEL.<br />

REFER TO DWG 000-D-2001<br />

TOC<br />

EL 297.850<br />

NEW CHEMICAL PIPING<br />

PHOTOGRAPH (CHEMICAL STORAGE)<br />

2<br />

000-D-5001<br />

REMOVE EXISTING 65 PVC<br />

SODIUM CARBONATE PIPE<br />

BACK TO SODA ASH ROOM.<br />

RUN 2 NEW 40-LS-PVC PIPES<br />

IN EXISTING PIPE TRAY ALONG<br />

SAME ROUTE AS REMOVED<br />

SODIUM CARBONATE PIPE<br />

NOTES:<br />

50-CDS-PVC<br />

RETENTION CHAMBER<br />

SODA ASH MIXING CHAMBER<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

EXISTING 40 PVC CHLORINE<br />

EXISTING 20 PVC<br />

ALUMINUM SULPHATE<br />

DIMENSIONS ARE APPROXIMATE.<br />

TERMINATE VERTICAL PIPE 500<br />

ABOVE BOTTOM OF SODA ASH<br />

4<br />

000-D-5001<br />

FL EL 293.450<br />

PROVIDE 40 NPT PVC TEE WITH PLUG.<br />

TERMINATE VERTICAL PIPE 1000 ABOVE<br />

SODA ASH MIXING CHAMBER FLOOR<br />

4<br />

000-D-5001<br />

50-CDS-PVC<br />

TERMINATE VERTICAL PIPE 500<br />

ABOVE BOTTOM OF SODA ASH<br />

RETENTION CHAMBER<br />

40-LS-PVC<br />

4<br />

000-D-5001<br />

2 REUSE EXISTING PIPE SLEEVES FROM<br />

SODIUM CARBONATE AND POLYELECTROLYTE<br />

000-D-5001PIPE<br />

REMOVAL DONE UNDER DEMOLITION ON<br />

THIS DRAWING<br />

40-LS-PVC FROM LIME ROOM (2 PIPES).<br />

RUN PIPES IN EXISTING PIPE TRAY<br />

ALONG SAME ROUTE AS REMOVED<br />

SODIUM CARBONATE PIPE. REFER TO<br />

DWG 000-D-2001 FOR CONTINUATION<br />

EXISTING 40 PVC CHLORINE<br />

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS TO FAMILIARIZE<br />

THEMSELVES WITH THE SCOPE OF WORK PRIOR TO PROCEEDING.<br />

SOME PIPING AND EQUIPMENT HAS BEEN OMITTED, FOR CLARITY.<br />

2. EXISTING BACKGROUND TAKEN FROM TOTTEN SIMS HUBICKI ASSOCIATES<br />

IN ASSOCIATION WITH RYSCO ENGINEERING CORPORATION. PROJECT<br />

52-6630, DRAWING M3, AS CONSTRUCTED SEPT. 91. EXISTING BACKGROUND<br />

HAS BEEN MODIFIED BY CH2M HILL TO SUIT THIS PROJECT. ALL BACKGROUND<br />

DATE<br />

PROJ<br />

SHEET<br />

VERIFY SCALE<br />

FILENAME: 000-D-2007_424251.dgn PLOT DATE: 2012\07\26 PLOT TIME: 8:25:55 AM<br />

DISTRICT M UNICIPALITY<br />

DWG<br />

OF M USKOKA<br />

FAIRYVIEW W ATER TREATMENT PLANT<br />

PROCESS MECHANICAL<br />

MB<br />

JPN<br />

ISSUED FOR TENDER<br />

07/2012<br />

0<br />

PHASE I UPGRADES<br />

BAR IS 25mm ON<br />

APVD<br />

BY<br />

REVISION<br />

DATE<br />

NO.<br />

CONTRACT 12-432-253<br />

PIPING MODIFICATIONS (2)<br />

ORIGINAL DRAWING.<br />

0 25 MM<br />

APVD<br />

CHK<br />

DSGN DR<br />

14of62<br />

ET JPN<br />

JPN RC<br />

2012/07/27<br />

424251<br />

000-D-2007<br />

CH2M HILL 2012. ALL RIGHTS RESERVED.<br />

c<br />

THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />

CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />

REUSE OF DOCUMENTS:<br />

ISSUED FOR TENDER