02.06.2013 Views

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

Drawings - Peak Engineering and Construction Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A<br />

B<br />

C<br />

D<br />

1 2 3 4 5 6<br />

D-102<br />

DEHUMIDIFIER<br />

CONNECT 20-NG-CS<br />

TO NEW DEHUMIDIFIER D-102<br />

CORRIDOR<br />

12-NG-CS DOWN TO GROUND<br />

FLOOR CORRIDOR. MOUNT<br />

12 PLUG VALVE, 12 PRESSURE<br />

REDUCING VALVE, 20x12 REDUCER<br />

IN VERTICAL ON SECOND FLOOR<br />

CORRIDOR. REFER TO SCHEMATIC<br />

ON DWG 000-M-2005 FOR DETAILS<br />

LOWER ROOF<br />

DP<br />

3<br />

000-D-5001<br />

20-NG-CS<br />

RUN ABOVE<br />

EXISTING<br />

SUSPENDED<br />

LINEAR METAL<br />

CEILING<br />

CONNECT 12-HW-CU AND<br />

12-CW-CU TO EXISTING<br />

DOMESTIC 20-HW-CU<br />

AND 20-CW-CU<br />

FILTER AND TANK AREA<br />

UPPER<br />

SODA ASH<br />

ROOM<br />

PARTIAL SECOND FLOOR PLAN<br />

FILTER AND TANK AREA<br />

12-HW-CU AND 12-CW-CU<br />

DOWN TO EMERGENCY<br />

EYEWASH MIXING VALVE.<br />

REFER TO DWG 000-M-2005<br />

FOR CONTINUATION<br />

CORRIDOR<br />

MECHANICAL ROOM<br />

REFER TO DRAWINGS<br />

000-M-1003 AND 000-M-2003<br />

FOR NATURAL GAS PIPING<br />

1:100 1:100<br />

DETAILS<br />

ELECTRICAL ROOM<br />

EXISTING<br />

ROOF HATCH<br />

PARTIAL UPPER ROOF PLAN<br />

18<br />

OSA<br />

42<br />

Elec 1<br />

NOTES:<br />

FILTER AND TANK AREA (BELOW)<br />

UNIT MAU-101<br />

MAU-101<br />

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS TO FAMILIARIZE<br />

THEMSELVES WITH THE SCOPE OF WORK PRIOR TO PROCEEDING.<br />

SOME PIPING AND EQUIPMENT HAVE BEEN OMITTED, FOR CLARITY.<br />

2. EXISTING BACKGROUND TAKEN FROM TOTTEN SIMS HUBICKI ASSOCIATES<br />

IN ASSOCIATION WITH RYSCO ENGINEERING CORPORATION. PROJECT<br />

52-6630, DRAWINGS A4 AND M16, AS CONSTRUCTED SEPT. 91. EXISTING<br />

BACKGROUND HAS BEEN MODIFIED BY CH2M HILL TO SUIT THIS PROJECT.<br />

ALL BACKGROUND DIMENSIONS ARE APPROXIMATE.<br />

DATE<br />

PROJ<br />

SHEET<br />

VERIFY SCALE<br />

FILENAME: 000-M-2006_424251.dgn PLOT DATE: 2012\07\25 PLOT TIME: 6:08:55 PM<br />

N<br />

CONNECT 40-NG-CS<br />

TO NEW MAKE-UP AIR<br />

40x20 REDUCER<br />

20 PRESSURE REDUCING<br />

VALVE<br />

20 PLUG VALVE<br />

MAKE-UP AIR UNIT<br />

20-NG-CS<br />

DOWN TO MECHANICAL<br />

ROOM BELOW. REFER<br />

TO SCHEMATIC ON<br />

DWG 000-M-2005 FOR<br />

DETAILS<br />

5<br />

000-A-5001<br />

DISTRICT M UNICIPALITY<br />

DWG<br />

OF M USKOKA<br />

FAIRYVIEW W ATER TREATMENT PLANT<br />

BUILDING MECHANICAL<br />

MB<br />

07/2012 ISSUED FOR TENDER<br />

LL<br />

0<br />

PHASE I UPGRADES<br />

BAR IS 25mm ON<br />

APVD<br />

BY<br />

REVISION<br />

DATE<br />

NO.<br />

CONTRACT 12-432-253<br />

ORIGINAL DRAWING.<br />

0 25 MM<br />

APVD<br />

CHK<br />

DSGN DR<br />

PLUMBING<br />

PARTIAL SECOND FLOOR<br />

AND ROOF PLANS<br />

424251<br />

000-M-2006<br />

36of62 LL<br />

SW<br />

RC<br />

LL<br />

2012/07/27<br />

CH2M HILL 2012. ALL RIGHTS RESERVED.<br />

c<br />

THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />

CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />

REUSE OF DOCUMENTS:<br />

ISSUED FOR TENDER

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!