Drawings - Peak Engineering and Construction Ltd
Drawings - Peak Engineering and Construction Ltd
Drawings - Peak Engineering and Construction Ltd
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A<br />
B<br />
C<br />
D<br />
1 2 3 4 5 6<br />
D-102<br />
DEHUMIDIFIER<br />
CONNECT 20-NG-CS<br />
TO NEW DEHUMIDIFIER D-102<br />
CORRIDOR<br />
12-NG-CS DOWN TO GROUND<br />
FLOOR CORRIDOR. MOUNT<br />
12 PLUG VALVE, 12 PRESSURE<br />
REDUCING VALVE, 20x12 REDUCER<br />
IN VERTICAL ON SECOND FLOOR<br />
CORRIDOR. REFER TO SCHEMATIC<br />
ON DWG 000-M-2005 FOR DETAILS<br />
LOWER ROOF<br />
DP<br />
3<br />
000-D-5001<br />
20-NG-CS<br />
RUN ABOVE<br />
EXISTING<br />
SUSPENDED<br />
LINEAR METAL<br />
CEILING<br />
CONNECT 12-HW-CU AND<br />
12-CW-CU TO EXISTING<br />
DOMESTIC 20-HW-CU<br />
AND 20-CW-CU<br />
FILTER AND TANK AREA<br />
UPPER<br />
SODA ASH<br />
ROOM<br />
PARTIAL SECOND FLOOR PLAN<br />
FILTER AND TANK AREA<br />
12-HW-CU AND 12-CW-CU<br />
DOWN TO EMERGENCY<br />
EYEWASH MIXING VALVE.<br />
REFER TO DWG 000-M-2005<br />
FOR CONTINUATION<br />
CORRIDOR<br />
MECHANICAL ROOM<br />
REFER TO DRAWINGS<br />
000-M-1003 AND 000-M-2003<br />
FOR NATURAL GAS PIPING<br />
1:100 1:100<br />
DETAILS<br />
ELECTRICAL ROOM<br />
EXISTING<br />
ROOF HATCH<br />
PARTIAL UPPER ROOF PLAN<br />
18<br />
OSA<br />
42<br />
Elec 1<br />
NOTES:<br />
FILTER AND TANK AREA (BELOW)<br />
UNIT MAU-101<br />
MAU-101<br />
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS TO FAMILIARIZE<br />
THEMSELVES WITH THE SCOPE OF WORK PRIOR TO PROCEEDING.<br />
SOME PIPING AND EQUIPMENT HAVE BEEN OMITTED, FOR CLARITY.<br />
2. EXISTING BACKGROUND TAKEN FROM TOTTEN SIMS HUBICKI ASSOCIATES<br />
IN ASSOCIATION WITH RYSCO ENGINEERING CORPORATION. PROJECT<br />
52-6630, DRAWINGS A4 AND M16, AS CONSTRUCTED SEPT. 91. EXISTING<br />
BACKGROUND HAS BEEN MODIFIED BY CH2M HILL TO SUIT THIS PROJECT.<br />
ALL BACKGROUND DIMENSIONS ARE APPROXIMATE.<br />
DATE<br />
PROJ<br />
SHEET<br />
VERIFY SCALE<br />
FILENAME: 000-M-2006_424251.dgn PLOT DATE: 2012\07\25 PLOT TIME: 6:08:55 PM<br />
N<br />
CONNECT 40-NG-CS<br />
TO NEW MAKE-UP AIR<br />
40x20 REDUCER<br />
20 PRESSURE REDUCING<br />
VALVE<br />
20 PLUG VALVE<br />
MAKE-UP AIR UNIT<br />
20-NG-CS<br />
DOWN TO MECHANICAL<br />
ROOM BELOW. REFER<br />
TO SCHEMATIC ON<br />
DWG 000-M-2005 FOR<br />
DETAILS<br />
5<br />
000-A-5001<br />
DISTRICT M UNICIPALITY<br />
DWG<br />
OF M USKOKA<br />
FAIRYVIEW W ATER TREATMENT PLANT<br />
BUILDING MECHANICAL<br />
MB<br />
07/2012 ISSUED FOR TENDER<br />
LL<br />
0<br />
PHASE I UPGRADES<br />
BAR IS 25mm ON<br />
APVD<br />
BY<br />
REVISION<br />
DATE<br />
NO.<br />
CONTRACT 12-432-253<br />
ORIGINAL DRAWING.<br />
0 25 MM<br />
APVD<br />
CHK<br />
DSGN DR<br />
PLUMBING<br />
PARTIAL SECOND FLOOR<br />
AND ROOF PLANS<br />
424251<br />
000-M-2006<br />
36of62 LL<br />
SW<br />
RC<br />
LL<br />
2012/07/27<br />
CH2M HILL 2012. ALL RIGHTS RESERVED.<br />
c<br />
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF<br />
CH2M HILL AND IS NOT TO BE USED, IN W HOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE W RITTEN AUTHORIZATION OF CH2MHILL.<br />
REUSE OF DOCUMENTS:<br />
ISSUED FOR TENDER