Dept Muni Activities Status / Results to Date<br />
AD: Specialty Coffee (Targets: 187 hectares; 249 Activity reformulated and sent to the USAID specialty coffee<br />
families)<br />
committee in <strong>June</strong> <strong>2007</strong> for informal approval. ARD-DA-061<br />
AD: Mora and Frijol (Targets: 59.2 hectares; 148 Pending contractual approval from USAID.<br />
families)<br />
ARD-DA-062<br />
LG: Public Services (Strengthen Urban and Rural In implementation, contract signed to strengthen the<br />
Public Services Companies)<br />
operations of aqueduct and sewage public service providers.<br />
The second phase of a plan to institutional strengthen 18 rural<br />
organizations in Totoró is underway.<br />
GL-045-C-010 (ACODAL)<br />
LG: Citizens Participation and Vulnerable Groups In implementation, grant signed in May <strong>2007</strong> to strengthen 17<br />
(Strengthen Organizations of Vulnerable Groups) indigenous groups. GL-058-G-042 (Fundación Sol y Tierra)<br />
LG: Citizens Participation and Vulnerable Groups Formulating a standard grant scope of work with Asociación<br />
(Improve community communication processes) de Medios de Comunicación Indígena del Cauca. GL-084<br />
LG: Citizens Participation and Vulnerable Groups In implementation, grant signed in <strong>June</strong> <strong>2007</strong>.<br />
(Strengthen Organizations of Vulnerable Groups)<br />
GL-094-G-051 (Totoguampa)<br />
SIF/ADAM Social Infrastructure / Education: In implementation. Results reported through Q6 (<strong>June</strong> <strong>2007</strong>):<br />
Construction of three classrooms in the Colegio 76 families benefited and 2.47 jobs created. 100% of funds<br />
Básico Pueblo Totoró Educational Center disbursed, construction completed. In total, the operational<br />
committee met seven times, the oversight committee twice.<br />
FIS-020-G-012 (Resquardo Indígena de Totoró)<br />
SIF/ADAM Social Infrastructure / Education: In implementation. Results reported through Q6 (<strong>June</strong> <strong>2007</strong>):<br />
Construction of two classrooms and a school 82 families benefited and 2.93 jobs created. 100% of funds<br />
cafeteria in the Novirao Educational Center. disbursed, 61% of construction completed. To date,<br />
operational committee has met 8 times, the oversight<br />
committee twice. Operational committee expressed interest<br />
for more resources to build an additional classroom.<br />
FIS-018-G-009 (Resquardo Indígena de Novirao)<br />
SIF/ADAM Social Infrastructure / Education: In implementation. Results reported through Q6 (<strong>June</strong> <strong>2007</strong>):<br />
Construction of three classrooms in the<br />
95 families benefited and 2.85 jobs created. 100% of funds<br />
Buenavista Educational Center.<br />
disbursed, construction completed. In total, operational<br />
committee met eight times, the oversight committee twice.<br />
FIS-019-G-011 (Resquardo Indígena de Paniquita)<br />
Cauca<br />
USAID/Colombia: Areas for Municipal-level Alternative Development (ADAM)<br />
<strong>Quarter</strong>ly Performance Monitoring Report 6 th <strong>Quarter</strong>: <strong>April</strong> - <strong>June</strong> <strong>2007</strong><br />