27.06.2013 Views

USF RO ManualOMRX_6.pdf

USF RO ManualOMRX_6.pdf

USF RO ManualOMRX_6.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE OF CONTENTS<br />

SECTION DESCRIPTION PAGE<br />

1.0 INT<strong>RO</strong>DUCTION<br />

1.1 System Function.................................................................................... 1-1<br />

1.2 Quality Assurance/Quality Control......................................................... 1-1<br />

1.3 Functions of the System Components................................................... 1-2<br />

2.0 SYSTEM INSTALLATION<br />

2.1 Precautions Before Installation.............................................................. 2-1<br />

2.2 Unpacking.............................................................................................. 2-1<br />

2.3 System Location .................................................................................... 2-1<br />

2.4 Power Requirements ............................................................................. 2-2<br />

2.5 Water Requirements.............................................................................. 2-2<br />

2.6 Product Line .......................................................................................... 2-2<br />

2.7 Reservoir (optional) ............................................................................... 2-2<br />

2.8 Accessory Sensors (Pretreat Interlock & Tank Level) ........................... 2-3<br />

2.9 Setting the Flush Cycle Time and Duration ........................................... 2-3<br />

2.10 Before Power Turn On........................................................................... 2-3<br />

2.11 Installation of Reverse Osmosis Membrane(s)...................................... 2-4<br />

3.0 OPERATING INSTRUCTIONS<br />

3.1 Controls and Indicators.......................................................................... 3-1<br />

3.2 Initial Startup of Reverse Osmosis System ........................................... 3-1<br />

3.3 Initial Flushing of the System................................................................. 3-2<br />

3.4 Normal Operations................................................................................. 3-2<br />

3.5 Shutdown (Less Than 4 Days) .............................................................. 3-4<br />

3.6 Long Term Shutdown Procedure........................................................... 3-4<br />

4.0 SYSTEM MAINTENANCE<br />

4.1 General.................................................................................................. 4-1<br />

4.2 Sanitizing the Reverse Osmosis System............................................... 4-1<br />

4.3 Cleaning the <strong>RO</strong> Membranes ................................................................ 4-5<br />

4.4 Maintenance Schedule ......................................................................... 4-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!