- Page 2 and 3: F I N A L R E P O R T POTOMAC RIVER
- Page 4 and 5: TABLE OF CONTENTS 6.1.2 Assumptions
- Page 6 and 7: TABLE OF CONTENTS FIGURES Figure 1-
- Page 8 and 9: ac acre A/E Architectural/Engineeri
- Page 10 and 11: TES Transportation and Environmenta
- Page 12 and 13: SECTION ONE: INTRODUCTION 1.1 POTOM
- Page 14 and 15: Introduction Factory and Strand Str
- Page 16 and 17: Refinement of Mitigation Measures S
- Page 18 and 19: 8.8 ft Figure 2-2: Flood Levels Stu
- Page 20 and 21: Refinement of Mitigation Measures T
- Page 22 and 23: Refinement of Mitigation Measures s
- Page 24 and 25: Overview of Flood Mitigation Measur
- Page 26 and 27: 3.1.3 Floodproofing Overview of Flo
- Page 28 and 29: FLOOD ELEVATION BASE FLOW Overview
- Page 30 and 31: Overview of Flood Mitigation Measur
- Page 32 and 33: Overview of Flood Mitigation Measur
- Page 34 and 35: Overview of Flood Mitigation Measur
- Page 36 and 37: Overview of Flood Mitigation Measur
- Page 40 and 41: E LURAY AV E GLENDALE AV EARL ST N
- Page 42 and 43: N ALFRED ST MUIRS CT S COLUMBUS ST
- Page 44 and 45: Technical Analyses Support resource
- Page 46 and 47: Table 4-1: Repetitive Loss Properti
- Page 48 and 49: Technical Analyses Support climate
- Page 50 and 51: 5.2 CALCULATION OF PROJECT BENEFITS
- Page 52 and 53: Economic Valuation (Benefit-Cost An
- Page 54 and 55: Economic Valuation (Benefit-Cost An
- Page 56 and 57: 6.1 FLOODWALL Structural Mitigation
- Page 58 and 59: Structural Mitigation Measure Conce
- Page 60 and 61: Structural Mitigation Measure Conce
- Page 62 and 63: 6.1.3 Potential Impacts Structural
- Page 64 and 65: VDEQ Section 401 Certification VDE
- Page 66 and 67: 6.2.1 Description of Alternative St
- Page 68 and 69: CLIENT PROJ RAMSAY AL SWIFTS AL S L
- Page 70 and 71: Structural Mitigation Measure Conce
- Page 72 and 73: 6.2.4 Permitting/Approval Requireme
- Page 74 and 75: 6.2.5 BCA and Results Structural Mi
- Page 76 and 77: Structural Mitigation Measure Conce
- Page 78 and 79: 6.3.2 Assumptions Structural Mitiga
- Page 80 and 81: Structural Mitigation Measure Conce
- Page 82 and 83: CLIENT PROJ REVISION NO SCALE WALES
- Page 84 and 85: Structural Mitigation Measure Conce
- Page 86 and 87: Site Plan Approval Structural Mitig
- Page 88 and 89:
North Union Structural Mitigation M
- Page 90 and 91:
Structural Mitigation Measure Conce
- Page 92 and 93:
CLIENT PROJ REVISION NO SCALE S ROY
- Page 94 and 95:
King Street Residential Structural
- Page 96 and 97:
Waterfront Commercial Structural Mi
- Page 98 and 99:
Structural Mitigation Measure Conce
- Page 100 and 101:
Structural Mitigation Measure Conce
- Page 102 and 103:
7.2 KING STREET Elevated Walkway Re
- Page 104 and 105:
Figure 7-2: Elevated Walkway at Wat
- Page 106 and 107:
Recommendations The elevated walkwa
- Page 108 and 109:
King/Strand Street Intersection Roa
- Page 110 and 111:
Figure 7-6: Floodwall behind Torped
- Page 112 and 113:
7.7 REPETITIVE LOSS PROPERTIES Reco
- Page 114 and 115:
Recommendations (USBC) and Internat
- Page 116 and 117:
SECTION EIGHT: REFERENCES Access Fl
- Page 118 and 119:
References Huber Technology, 2009.
- Page 120 and 121:
Appendix A Initial Ranking of Poten
- Page 122 and 123:
Appendix B Ordinance and Sandbag In
- Page 124 and 125:
Exhibit 1-2. Sample ordinance from
- Page 126 and 127:
5. The necessity to the facility of
- Page 128 and 129:
Appendix C Non-Prioritized Measures
- Page 130 and 131:
Figure 1: Duckbill Check Valve A ty
- Page 132 and 133:
Relocate external electrical boxes
- Page 134 and 135:
Last, Hurricane Preparedness inform
- Page 136 and 137:
Potomac River Waterfront Flood Miti
- Page 138 and 139:
Figure A1-12 Exhibit 2: Field Visit
- Page 140 and 141:
Exhibit 2: Field Visit Summary - Ju
- Page 142 and 143:
Exhibit 2: Field Visit Summary - Ju
- Page 144 and 145:
Exhibit 2: Field Visit Summary - Ju
- Page 146 and 147:
Exhibit 2: Field Visit Summary - Ju
- Page 148 and 149:
Fig A11-1 Exhibit 2: Field Visit Su
- Page 150 and 151:
Exhibit 2: Field Visit Summary - Ju
- Page 152 and 153:
Figure A18-1 Exhibit 2: Field Visi
- Page 154 and 155:
Figure 21-3 Exhibit 2: Field Visit
- Page 156 and 157:
Figure 2: Screen shot from NOAA Atl
- Page 158 and 159:
Potomac River Waterfront Flood Miti
- Page 160 and 161:
38 40 38 4 6 40 34 28 14 30 30 40 4
- Page 162 and 163:
46 44 38 44 42 40 42 44 44 36 22 36
- Page 164 and 165:
48 44 38 36 38 18 46 42 38 42 26 22
- Page 166 and 167:
CLIENT PROJ REVISION NO SCALE City
- Page 168:
Table 4: Detailed cost estimate for
- Page 174 and 175:
Exhibit 3: Various Elevated Walkway
- Page 176 and 177:
Table 7: Detailed cost estimate for
- Page 178 and 179:
Exhibit 4-2: Elevated Walkway - Kin
- Page 180 and 181:
Appendix H Berm
- Page 182 and 183:
Table 4: Detailed cost estimate for
- Page 184 and 185:
Roadway Drainage Additional Data Ta
- Page 186 and 187:
Appendix J Property Acquisition
- Page 188 and 189:
Appraisals Based on data from Appra
- Page 190 and 191:
Exhibit 2. Total Other Costs for Pr
- Page 192 and 193:
Table 4: North Union Acquisition Co
- Page 194 and 195:
Appendix K Floodproofing
- Page 196 and 197:
Exhibit 2. Window Replacement Costs
- Page 198 and 199:
Elevate or relocate the electric pa
- Page 200 and 201:
Overview Potential Federal Funding
- Page 202 and 203:
Table 1. HMA Funding Options by Pro
- Page 204 and 205:
Hazard Mitigation Assistance The De
- Page 206 and 207:
program comparisons (continued) ELI
- Page 208:
program information GovDelivery Not