30.06.2013 Views

GDN Calibration Manual - Kele

GDN Calibration Manual - Kele

GDN Calibration Manual - Kele

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Using the IAQPoint<br />

Programming Menus<br />

A confirmation screen is briefly displayed and the zero calibration begins.<br />

*Menu*<br />

In Calib<br />

A success or failure message is displayed and the screen returns to the<br />

main menu option.<br />

CO2 Set Zero<br />

SUCCESS<br />

Calibrating the CO2 Sensor<br />

This option allows users to calibrate the sensor’s span.<br />

Note: When calibrating a duct mounted unit, the unit must be removed<br />

from its base to ensure proper calibration.<br />

• Before starting the calibration (using the programming menus),<br />

connect the regulator to the gas cylinder.<br />

• Adjust the flow rate to 0.1 L/min.(for the 2000 ppm range)<br />

• Connect the tubing from the regulator to the sensor, as shown in the<br />

image at left.<br />

Start exposing the sensor to the calibration gas at least<br />

10 minutes before starting and throughout the calibration<br />

process.<br />

• Let the gas flow for at least 10 minutes before starting the calibration.<br />

• Scroll to the “CO 2 Set Span” main menu option and press Enter to<br />

select.<br />

* Menu *<br />

CO2 Set Span<br />

• The next screen allows you to specify the span calibration gas<br />

concentration value.<br />

Set Span Gas<br />

2000<br />

26 IAQPoint User <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!