and market considerations. They also reflect the minimum requirements for physical<br />

improvements needed to achieve the identity and place making goals of <strong>Jackson</strong> <strong>Square</strong>.<br />

These Urban Design considerations are discussed in greater detail in Section 3.3.<br />

Prior to submitting the DPIR, the design and development teams will refine and expand this<br />

phasing plan. The infrastructure scope and funding sources will be further developed, with<br />

a goal of advancing the scope of the infrastructure beyond the ”minimum requirements”<br />

shown in the current phasing plans. The phasing plans will also address the ”interim<br />

conditions,” that is, the improvements that can be provided on the undeveloped site areas<br />

to ensure that at each phase of development, <strong>Jackson</strong> <strong>Square</strong> will look attractive and be<br />

safe.<br />

Early Start<br />

An early start, preparatory phase, is expected to commence in the third quarter of 2007 and<br />

be completed in the fourth quarter of 2008. The most significant part of the early start<br />

scope is the replacement of the existing Division of Youth Services (DYS) facility<br />

(Building F), which is currently located in an “ell” building attached to<br />

1542 Columbus Avenue; this “ell” must be demolished to allow for construction of the new<br />

retail/residential building (Building C). Temporary access, surface parking spaces and<br />

outdoor play space will be developed as part of the DYS facility. In addition, an early start<br />

to the environmental remediation of a portion of Site I will help ensure a timely start of the<br />

buildings on Site I.<br />

Phase 1<br />

Construction of Phase 1 is expected to commence in the second quarter of 2008 and be<br />

completed in the second quarter of 2010. Phase 1 must make a significant impact to<br />

establish the new <strong>Jackson</strong> <strong>Square</strong>. Thus, projects are planned on both sides of Columbus<br />

Avenue. On Site I, the Phase 1 program will include 94 apartments and 22,600 square feet<br />

of retail space, as well as the Youth and Family Center, plus associated parking and site<br />

improvements (Buildings A and B). The housing program is a mixed-income rental<br />

building, which is the most feasible way to develop a building of scale on this key parcel.<br />

On Site II, the Phase 1 program will include the creation of a mixed-use building on the<br />

corner of Columbus Avenue and Ritchie Street, with 14,600 square feet of retail space on<br />

the ground floor and 42 units of affordable and moderate income ownership housing<br />

above, introducing needed home ownership opportunities which are lacking in this area<br />

(Building C). With the relocation of DYS, the Webb Building will be fully renovated for<br />

office space (Building D). The Site II projects are planned to use surface parking on a<br />

temporary basis.<br />

1772/<strong>PNF</strong>/ <strong>Jackson</strong> <strong>Square</strong> Page 2-6 Project Description<br />