03.07.2013 Views

TRIAC Progress Report - KEK

TRIAC Progress Report - KEK

TRIAC Progress Report - KEK

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

measured with Faraday cups, FC1, FC2 and FC3. FC1 is installed at the entrance, and<br />

FC2 at the exit of RFQ. A quadrupole doublet is installed between FC2 and FC3. Under<br />

the condition when the magnetic field strength of the quadrupole doublet is sufficient to<br />

focus the accelerated ions into FC3, the transmission for the accelerated ions is obtained<br />

from I(FC3) / I(FC1). Here, I(FCi) is the beam current from the i-th Faraday cup. The<br />

transmission for the drift-through ions (containing unaccelerated ions) is given by<br />

I(FC2) / I(FC1).<br />

2-16. Transmission of the RFQ vs. intervane voltage<br />

Fig. 2-17. Transmission along the accelerator.<br />

The measured transmission is about 90 % at design voltage and agrees well with the<br />

simulation by PARMTEQ [2-12]. From Fig. 2-16, it was verified that the intervane<br />

voltage is applicable in a very wide range from 109 kV down to 1/14 of that voltage.<br />

The transmission efficiencies of the RF/ IH linac were measured along the accelerator<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!