22.07.2013 Views

Barking Station Masterplan Document PDF 12 MB - Meetings ...

Barking Station Masterplan Document PDF 12 MB - Meetings ...

Barking Station Masterplan Document PDF 12 MB - Meetings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tanner Street<br />

2.1.14 The award winning Tanner Street 7 is a mixed tenure scheme of white rendered<br />

residential terraces and a 10 storey tower. Completed in 2006, the development is<br />

located to the north west of the <strong>Station</strong> <strong>Masterplan</strong> area. Jestico + Whiles and<br />

Peter Barber Architects collaborated to create a traditional street pattern of<br />

predominantly low-rise terraces with private gardens, delivering a high quality<br />

housing scheme which replaced three uninspiring blocks of flats. The high-density<br />

homes range from one-bedroom flats to four-bedroom townhouses and include<br />

properties for private sale, shared ownership, shared-ownership self-build, and<br />

affordable rent.<br />

London Road / North Street<br />

2.1.15 Located in the heart of the town centre the London Road / North Street site,<br />

BTCSSA1 of the <strong>Barking</strong> Town Centre Area Action Plan, will see the delivery of<br />

some 100 homes, a Skills Centre, a large food store together, a number of<br />

individual retail units and a new public space - Market Square.<br />

2.1.16 Works began on site in 2010, with phase 1 of the scheme expected to be<br />

completed in September 20<strong>12</strong>. Designed by Rick Mather Architects, the initial<br />

phase is for a Skills Centre, a new type of educational facility, providing 14-19 year<br />

olds with vocational training in hospitality, construction, hair and beauty and IT.<br />

Included in this development is a Bistro, a new eating establishment for the town<br />

centre which will give the students an opportunity to train in a real working<br />

environment. The <strong>Barking</strong> Methodist Church will front onto the newly created<br />

public realm, Market Square, and will include community function spaces and<br />

meeting rooms. The Skills Centre will also provide opportunities for the public to<br />

attend seminars, lectures and other events.<br />

2.1.17 Phase 2 of the scheme is due to start on site in Autumn 20<strong>12</strong> and is targeted for<br />

completion in March 2015. This later development will conclude works to the public<br />

realm, deliver new homes, a large food store and see improved active retail<br />

frontage onto Abbey Green.<br />

Figure 6: Illustration of the Skills Centre<br />

7 RIBA Award Winner, 2007<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!