Article 6 Cont’d<br />

Environmental Compliance Officer plan to attend a seminar <strong>of</strong> alternative fuel<br />

vehicles.<br />

Potential purchase <strong>of</strong> a pre-owned vehicle will also be explored.<br />

Replacement <strong>of</strong> LF-19<br />

The small areas for which this item is used have not previously been put out for<br />

contract because the current approach allows for the flexibility <strong>of</strong> mowing these<br />

areas during slow times. Based on the current contract rate <strong>of</strong> between $29 and<br />

$50 per acre, it is anticipated that contracting these would be more costly.<br />

The cost <strong>of</strong> increased overtime, if this equipment was not purchased was<br />

calculated to be well in excess <strong>of</strong> the cost <strong>of</strong> the equipment spread over its nine<br />

year projected service life.<br />

Street Light Replacement<br />

There may be some energy credits available from NStar for these replacements.<br />

Advantages <strong>of</strong> the new lights include:<br />

- Energy use reduced by 42% - 52%<br />

- Higher, more focused light output<br />

- Increased life expectancy<br />

- Contain no mercury or other heavy metals<br />

Replace DPW Passageway Doors<br />

Although the doors being proposed, at a cost <strong>of</strong> $3,220 each, carry a lifetime<br />

warranty, it was suggested that metal doors, at a cost <strong>of</strong> $1,850 each, with a 10year<br />

life, might be satisfactory, given that the existing metal doors have lasted for<br />

20 years.<br />

Replacement <strong>of</strong> Dumpsters<br />

Leasing is an option for the dumpsters, but damage and repairs would not be<br />

covered.<br />

Compacting has been explored, but is expensive since the weight <strong>of</strong> the compacted<br />

material requires the additional expense <strong>of</strong> a service to move it.<br />

Replacement <strong>of</strong> Guardrails<br />

It was suggested the Public Safety Committee should be involved in the decisions<br />

regarding need for additional guardrails and their replacement.<br />

The Board <strong>of</strong> Selectmen voted 5-0-0 to recommend favorable action for $797,380<br />

with respect to the subject matter <strong>of</strong> Article 6.<br />

MOTION A: (majority vote required)<br />

Move that the <strong>Town</strong> vote to appropriate from Tax Levy the sum <strong>of</strong> $147,380 to be<br />

expended under the direction <strong>of</strong> the Director <strong>of</strong> Public Works for the purpose <strong>of</strong><br />

funding Capital Items 2 through 9 listed above.<br />