1. Details of watershed:<br />
Impact Assessment Report<br />
Balabadrayapally Watershed, DPAP-I Batch<br />
Kosgi Mandal, Mahabubnagar district, Andhra Pradesh<br />
i. Name of the Scheme: DPAP-I Batch<br />
ii. Name of the watershed:<br />
iii. Names of villages in the<br />
Watershed:<br />
iv. Villages/Mandal/District:<br />
v. Name and Address of PIA:<br />
vi. Total area of the watershed: 500 ha<br />
2. Land Use Pattern:<br />
i. Arable land (ha) NA<br />
ii. Non arable land (ha) NA<br />
iii. Government/Community<br />
land (ha)<br />
NA<br />
iv. Private land (ha) NA<br />
v. Treated arable 500 ha<br />
vi. Treated non arable NA<br />
3. Verification financial and other Records<br />
Balabadrayapally<br />
Balabadrayapally<br />
Balabadrayapally/Kosgi/Mahabubnagar<br />
Vana Samrakshana Samithi, Kosgi<br />
i. Total Budget: Approved: Rs. 1565000 Spent: Rs.1609415<br />
ii. Expenditure incurred as<br />
per guidelines<br />
Rs.1609415<br />
iii. Works executed as per<br />
Records<br />
iv. Whether watershed<br />
committees exits<br />
v. if exists, activities of the<br />
committees<br />
CDs: 6 (Breaches Noticed), Bunding was taken up in 305<br />
acres and it has been in good condition,<br />
PTs :12 (Revetment stolen), LBS/ RFDs: 220 (Not in good<br />
condition, boulders removed and used for other purposes)<br />
CCTs=35 m length were dug, desilting of a tank was done<br />
Chairman : T. Ravindra Reddy, Members : 10<br />
President : T. Rami Reddy, Gramin Member : 2<br />
Secretary : Ibrahim, GP member : 2<br />
Nil<br />
4. Community participation (how community participation have been ensured and what<br />
EPA have been taken up, inputs of details of beneficiaries)<br />
EPA: No entry point activity was taken up in this project.<br />
20