Download (1660Kb) - OAR@ICRISAT
Download (1660Kb) - OAR@ICRISAT
Download (1660Kb) - OAR@ICRISAT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
vi. Changes in size and<br />
character of livestock<br />
holdings<br />
vii. Status of grazing land &<br />
their carrying capacity<br />
viii. Employment generated<br />
due to implementation of<br />
project<br />
ix. Change in household<br />
category, total & source<br />
viii. Freedom from Debt and<br />
reduction in degree of<br />
dependence of money<br />
lenders (case studies)<br />
ix. Reduction in out-migration<br />
(case studies)<br />
x. Reduction in drought<br />
vulnerability of the<br />
watershed<br />
xi. Detailed case studies of<br />
specific farmers impacted<br />
by the project<br />
xii. Photographs showing work<br />
+ its impact<br />
Milch animals increased by about 100, i.e. almost doubled<br />
Employment increased by 100%, number of labor days of<br />
work availability almost doubled with rabi cropping<br />
additionally in the watershed area.<br />
NA<br />
Dependence on private money lenders decreased. Now,<br />
farmers have their own funds for inputs. Financial<br />
situation of farming families improved.<br />
NREGS has reduced out migration. People are back to<br />
villages due to sufficient work availability and higher<br />
wages.<br />
Due to more groundwater availability they could<br />
withstand drought, untreated area no crops<br />
Mr. S. Venkata Reddy S/o Narsimha Reddy had good<br />
benefits due to horticulture developed because of<br />
improved ground water.<br />
Mr. Balaswamy also got good benefit from watershed<br />
activities<br />
7. Learnings and process documentation (how the program could be implemented better;<br />
constraints, improvements possible, Changes made etc.)<br />
8. Specific datasets on different impact parameters:<br />
9. Observations and Comments by Evaluators:<br />
• Relevance of the Location of the structures was appropriate, considering technical<br />
inputs.<br />
• Physical measurements matched with Measurement books and structures are of<br />
good quality.<br />
• 100 Bore well in the watershed and ground water available at 80 ft deep. Damages<br />
were there for water harvesting structures and repair and maintenance were not<br />
done so far.<br />
44