Download (1660Kb) - OAR@ICRISAT
Download (1660Kb) - OAR@ICRISAT
Download (1660Kb) - OAR@ICRISAT
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1. Details of watershed:<br />
Impact Assessment Report<br />
Chinnarevallay Watershed, DPAP-I Batch<br />
Balanagar Mandal, Mahabubnagar district, Andhra Pradesh<br />
i. Name of the Scheme: DPAP-I Batch<br />
ii. Name of the watershed:<br />
iii. Names of villages in the<br />
Watershed:<br />
iv. Villages/Mandal/District:<br />
v. Name and Address of PIA:<br />
vi. Total area of the watershed: 500 ha<br />
2. Land Use Pattern:<br />
i. Arable land (ha)<br />
ii. Non arable land (ha)<br />
iii. Government/Community<br />
land (ha)<br />
iv. Private land (ha)<br />
v. Treated arable 500 ha<br />
vi. Treated non arable<br />
Chinnarevallay<br />
Chinnarevallay<br />
3. Verification financial and other Records<br />
Chinnarevallay/Balanagar/ Mahabubnagar<br />
Dy. Executive Engineer, MDT-I, Mahabubnagar<br />
i. Total Budget: Rs. 1657585 Approved: Rs.16,57,585 Spent: Rs. 16,57,070<br />
ii. Expenditure incurred as<br />
per guidelines<br />
Rs. 1657070<br />
iii. Works executed as per<br />
Records<br />
iv. Whether watershed<br />
committees exits<br />
v. if exists, activities of the<br />
committees<br />
Yes, CDs: 4 (side walls breaches noticed and confirmed),<br />
PTs: 1, Field Bunding: 345 ha, RFDs/LBS: 200 plus, Sunken<br />
pits: 30<br />
Yes, Chairman: M.Chandraiah<br />
President: K.Chandramohan<br />
Secretary: B.Kasiram<br />
4. Community participation (how community participation have been ensured and what<br />
EPA have been taken up, inputs of details of beneficiaries)<br />
Entry Point Activity: Community contributed through 50% Shramadhanam for a bus<br />
shelter constructed in the village at a cost of Rs.50400/-<br />
34