24.07.2013 Views

Econoflame R2700/R2800/R2900 boilers - CMS

Econoflame R2700/R2800/R2900 boilers - CMS

Econoflame R2700/R2800/R2900 boilers - CMS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.2.3 Ventilation The ventilation of the boiler room must satisfy the applicable<br />

national and local standards and regulations (see Supplement).<br />

5.3 Connections<br />

With regard to ventilation, pay particular attention to the following<br />

points:<br />

a Observe the applicable national and local standards and<br />

regulations for the dimensions of the openings and the protection<br />

for any mechanical ventilation<br />

b Ensure that the air inlet openings are transversely placed in<br />

two opposite walls<br />

c Fit inlet gratings with a large width and a small height<br />

d Ensure that the correct amount of high level ventilation exists<br />

e If the air supply is inadequate, it may be necessary to fit a<br />

mechanical means of providing adequate ventilation.<br />

5.3.1 Gas connection The gas connection must be made by a recognised installer in<br />

accordance with the applicable national and local standards<br />

and regulations (see Supplement).<br />

The gas connection is made at the rear of the boiler.<br />

Types 00 - 03 are not suitable for immediate connection to a<br />

100 mbar natural gas system. The pressure of the gas supplied<br />

to the unit must be reduced to 25 mbar for natural gas or 50<br />

mbar for propane with the use of a gas pressure regulator.<br />

From type 04, all <strong>boilers</strong> are suitable for gas supply pressures<br />

of both 25 and 100 mbar on natural gas.<br />

The loss of pressure in the connecting pipes must be such that,<br />

at maximum boiler capacity, the pressure must never fall below<br />

18 mbar for natural gas or 30 mbar for propane.<br />

5.3.2 Electrical connection The electrical connections and provisions must comply with the<br />

applicable national and local standards and regulations (see<br />

Supplement).<br />

The units are wired in accordance with the electrical diagram<br />

supplied with the appliance.<br />

The electrical connections, the terminals and the boiler pump<br />

relay are mounted in a separate connection box behind the<br />

front panel (extrusion profile, see fig. 4).<br />

2789CV02C 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!