25.07.2013 Views

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Scope <strong>of</strong> Work HBCR03A<br />

• Repair cap beams<br />

• Repair approach pavement<br />

• Repair utility supports<br />

• Improve drainage, lighting<br />

• Improve fender system<br />

• Repair sign structures<br />

• Perform localized painting and provide work zone traffic control.<br />

9. Location BIN 2-05580-2 <strong>10</strong>. Location BIN 2-24231-9<br />

<strong>10</strong>. FEATURE CARRIED: GRAND CONCOURSE; FEATURE CROSSED: E 174 th<br />

ST.<br />

BOROUGH OF BRONX; BIN: 2-24231-9<br />

The rehabilitation <strong>of</strong> this single span concrete arch deck bridge is required based on the<br />

general recommendation rating <strong>of</strong> 4.0 that has been given in the 20<strong>10</strong> NYSDOT biennial<br />

inspection report and engineering evaluation. The construction scope <strong>of</strong> work includes;<br />

• Repair wearing surface, sidewalk, curb and fascia,<br />

• Repairs railing and parapet<br />

• Repair underdeck unsound areas<br />

• Repairs stem breast wall<br />

• Lighting repair and perform work zone traffic control.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!