Scope <strong>of</strong> Work HBCR03A<br />

2. PRELIMINARY DESIGN CONTINGENCY ALLOWANCES:<br />

UNDERWATER INSPECTION: $ 0<br />

STEEL SAMPLING: $ 0<br />

FLAGGED CONDITIONS: $ 2,000<br />

$ 2,000<br />

3.PRELIMINARY DESIGN OUT OF POCKET ALLOWANCES: $ 6,000<br />

4. Final Design Budgetary Allowances: $ 4,000<br />

5. Final Design Contingency Allowances: $ 3,000<br />

6. Final Design Out <strong>of</strong> Pocket (OPE) Allowances: $ 9,000<br />

$ 16,000<br />

6. BIN: 2-24945-0 YEAR BUILT: 1952<br />

FEATURE CARRIED: FREEMONT AVE PED BR.; CROSSED: SIRT SOUTH SHORE<br />

Existing structure: steel multi beam pedestrian bridge; 4/3/2009 inspection rating: 4.0 (<strong>NYC</strong>DOT)<br />

Estimated number <strong>of</strong> preliminary plans: 16<br />

Estimated number <strong>of</strong> final plans: 20<br />

1. PRELIMINARY DESIGN BUDGETARY ALLOWANCES:<br />

CORING/ Sampling $ 0<br />

ENCASEMENT REMOVAL $ 0<br />

PERMITS/ SAMPLING/ TESTING $ 0<br />

SURVEY $ 0<br />

FORCE ACCOUNT $ 15,000<br />

$ 15,000<br />

2. PRELIMINARY DESIGN CONTINGENCY ALLOWANCES:<br />

UNDERWATER INSPECTION: $ 0<br />

STEEL SAMPLING: $ 0<br />

FLAGGED CONDITIONS: $ 4,000<br />

$ 4,000<br />

3. PRELIMINARY DESIGN OUT OF POCKET ALLOWANCES: $ 6,000<br />

4. Final Design Budgetary Allowances: $ 15,000<br />

5. Final Design Contingency Allowances: $ 3,000<br />

6. Final Design Out <strong>of</strong> Pocket (OPE) Allowances: $ 9,000<br />

$ 27,000<br />

7. BIN: 2-24444-0 YEAR BUILT: 1960<br />

FEATURE CARRIED: SOUTH OF TILLARY ST.; FEATURE CROSSED: NAVY ST.<br />

Existing structure: concrete pedestrian bridge; 7/23/20<strong>10</strong> inspection rating: 4.0 (<strong>NYC</strong>DOT)<br />

Estimated number <strong>of</strong> preliminary plans: 14<br />

Estimated number <strong>of</strong> final plans: 18<br />

1. PRELIMINARY DESIGN BUDGETARY ALLOWANCES:<br />

CORING/ Sampling $ 0<br />

ENCASEMENT REMOVAL $ 0<br />