- Page 1: Michael R. Bloomberg The City of Ne
- Page 6 and 7: A. Purpose of the RFP SECTION II -
- Page 8 and 9: SECTION IV: FORMAT AND CONTENT OF T
- Page 10 and 11: B. Proposal Package Contents (“Ch
- Page 12: D. Exclusion from Participation in
- Page 15 and 16: SECTION VII A) PROPOSED CONTRACTUAL
- Page 17 and 18: Target Sub Contracting and M/WBE %a
- Page 19 and 20: 3. FEATURE CARRIED: KNAPP STREET.;
- Page 21 and 22: Scope of Work HBCR03A 7. Location B
- Page 23 and 24: PROJECT BRIDGE DATA: Rehabilitation
- Page 25 and 26: Scope of Work HBCR03A 3. PRELIMINAR
- Page 27 and 28: Scope of Work HBCR03A PERMITS/ SAMP
- Page 29 and 30: Scope of Work HBCR03A 5. Final Desi
- Page 31 and 32: The Project Manager shall have a mi
- Page 33 and 34: 10. The Consultant shall prepare dr
- Page 35 and 36: B. PRELIMINARY DESIGN INCLUDED HERE
- Page 37 and 38: Steel Sampling Program for the proj
- Page 39 and 40: 2. BRIDGE RECONSTRUCTION PROJECT RE
- Page 41 and 42: 13) Plans and Sections 14) Land Use
- Page 43 and 44: d. The Consultant shall submit six
- Page 45 and 46: 1) A complete set of Survey and the
- Page 47 and 48: The Consultant understands and agre
- Page 49 and 50: The Consultant's compression evalua
- Page 51 and 52: ) Separated by budget lines, on a "
- Page 53 and 54: The Consultant shall submit these i
- Page 55 and 56:
4. The Consultant shall attend liai
- Page 57 and 58:
e. The total compensation for the P
- Page 59 and 60:
. For approved out-of-pocket costs
- Page 61 and 62:
E. COST LIMITATIONS 1. PRELIMINARY
- Page 63 and 64:
IV. TIME OF COMPLETION The Consulta
- Page 65 and 66:
2. FINAL DESIGN a) The preparation
- Page 67 and 68:
PROCEDURE FOR BRIDGE RECONSTRUCTION
- Page 69 and 70:
Contents Page No. 3.16 Land Use Ass
- Page 71 and 72:
3. BRIDGE RECONSTRUCTION PROJECT RE
- Page 73 and 74:
3. Projected future traffic based o
- Page 75 and 76:
NYC Parks. The Engineer shall conta
- Page 77 and 78:
A review of as- built (or existing)
- Page 79 and 80:
placed in Type 1A steel 55-gallon d
- Page 81 and 82:
The Engineer shall perform a hands-
- Page 83:
• A diagram of the above referenc
- Page 88 and 89:
3.12.2 ESSENTIAL OR OTHERS BRIDGES
- Page 90 and 91:
5. Utilities will not be supported
- Page 92 and 93:
• Provide Section, Block and Lot
- Page 94 and 95:
To perform above described tasks 3.
- Page 96 and 97:
The Engineer shall possess high deg
- Page 98 and 99:
4.0. DRAFT BRPR The Engineer shall
- Page 100 and 101:
• Work Zone Traffic Control Plan
- Page 102 and 103:
APPENDIX - A BRPR FORMAT AND REQUIR
- Page 104 and 105:
• Skew • Type of deck (and dept
- Page 106 and 107:
• Framing Plan, identify all memb
- Page 108 and 109:
• FIELD INSPECTION: Discuss the o
- Page 110 and 111:
• PHOTOS: Original colored photos
- Page 112 and 113:
9.0 WORK ZONE TRAFFIC CONTROL The E
- Page 114 and 115:
APPENDIX - B B.I.N: FEATURE CARRIED
- Page 116 and 117:
APPENDIX C INSTRUCTIONS FOR PRESENT
- Page 118 and 119:
I. LOCATION APPENDIX D B.I.N.: ____
- Page 120 and 121:
____________ Vertical: Grade: _____
- Page 122 and 123:
VIII. WATERWAY SUPPLEMENT: For wate
- Page 124 and 125:
EXISTING DOWNSTREAM STRUCTURE: B.I.
- Page 126 and 127:
k) Location of fixed and expansion
- Page 128 and 129:
4. APPROACH SECTIONS a) Section thr
- Page 130 and 131:
9. WORK ZONE TRAFFIC CONTROL - SECT
- Page 132 and 133:
APPENDIX F FIELD SURVEY REQUIREMENT
- Page 134:
SPECIFICATIONS FOR THE PREPARATION
- Page 137 and 138:
SECTION 1: REQUIREMENTS FOR THE PRE
- Page 139 and 140:
1.5 LETTERING ON DRAWINGS Lettering
- Page 141 and 142:
SECTION 2: REQUIREMENTS FOR THE PRE
- Page 143:
2.4 DISC PACKAGING Pursuant to the
- Page 151 and 152:
NOTICE TO VENDORS Please be advised
- Page 153 and 154:
Appendix A (Architects and Engineer
- Page 155 and 156:
Appendix A (Architects and Engineer
- Page 157 and 158:
Appendix A (Architects and Engineer
- Page 159 and 160:
Appendix A (Architects and Engineer
- Page 161 and 162:
Appendix A (Architects and Engineer
- Page 163 and 164:
Appendix A (Architects and Engineer
- Page 165 and 166:
Appendix A (Architects and Engineer
- Page 167 and 168:
Appendix A (Architects and Engineer
- Page 169 and 170:
Appendix A (Architects and Engineer
- Page 171 and 172:
Appendix A (Architects and Engineer
- Page 173 and 174:
Appendix A (Architects and Engineer
- Page 175 and 176:
Appendix A (Architects and Engineer
- Page 177 and 178:
Appendix A (Architects and Engineer
- Page 179 and 180:
Appendix A (Architects and Engineer
- Page 181 and 182:
Appendix A (Architects and Engineer
- Page 183 and 184:
Appendix A (Architects and Engineer
- Page 185 and 186:
Appendix A (Architects and Engineer
- Page 187 and 188:
Appendix A (Architects and Engineer
- Page 189 and 190:
Appendix A (Architects and Engineer
- Page 191 and 192:
Appendix A (Architects and Engineer
- Page 193 and 194:
Appendix A (Architects and Engineer
- Page 195 and 196:
Appendix A (Architects and Engineer
- Page 197 and 198:
Appendix A (Architects and Engineer
- Page 199 and 200:
Appendix A (Architects and Engineer
- Page 201 and 202:
Appendix A (Architects and Engineer
- Page 203 and 204:
Appendix A (Architects and Engineer
- Page 205 and 206:
(3) ban provocative religious or po
- Page 207 and 208:
Proposer: Name: Address: Tax Identi
- Page 209 and 210:
FORM - 3P AFFIRMATION FORM The unde
- Page 211 and 212:
E-PIN: 84112P0003 PIN: 84112MBBR608
- Page 213 and 214:
E-PIN: 84112P0003 PIN: 84112MBBR608
- Page 215 and 216:
FORM 4T - JOB TITLES AND HOURS PROP
- Page 217 and 218:
FORM 4T - JOB TITLES AND HOURS PROP
- Page 219 and 220:
FORM 4T - JOB TITLES AND HOURS PROP
- Page 221 and 222:
FORM 4T - JOB TITLES AND HOURS PROP
- Page 223 and 224:
FORM 4T - JOB TITLES AND HOURS PROP
- Page 225 and 226:
FORM 5T Remaining work with NYCDOT
- Page 227 and 228:
FORM 4T1 - LABOR COST PROPOSAL PROJ
- Page 229 and 230:
FORM 4T1 - LABOR COST PROPOSAL PROJ
- Page 231 and 232:
FORM 4T1 - LABOR COST PROPOSAL PROJ
- Page 233 and 234:
FORM 4T1 - LABOR COST PROPOSAL PROJ
- Page 235 and 236:
FORM 4T1 - LABOR COST PROPOSAL PROJ
- Page 237 and 238:
FORM 4T2 - COST PROPOSAL SUMMARY PR
- Page 239 and 240:
FORM 4T2 - COST PROPOSAL SUMMARY PR
- Page 241 and 242:
FORM 4T2 - COST PROPOSAL SUMMARY PR
- Page 243 and 244:
FORM 4T2 - COST PROPOSAL SUMMARY PR
- Page 245 and 246:
FORM 4T2 - COST PROPOSAL SUMMARY PR
- Page 247 and 248:
FORM 4T - COST PROPOSAL - GRAND TOT
- Page 249:
SECTION VII F) MINORITY/WOMEN BUSIN
- Page 263 and 264:
VENDEX ATTACHMENT G Upon completion
- Page 265:
SECTION VII H) LOCAL LAW 34: DOING