25.07.2013 Views

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

Component Rehabilitation of 10 Bridges, Citywide - NYC.gov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9. BIN: 2-05580-2 YEAR BUILT: 1981<br />

FEATURE CARRIED: NORTHERN BLVD. E/B; FEATUE CROSSED: FLUSHING RIVER<br />

Existing super structure: 40 spans steel stringer multi girder; 3 lanes; <strong>10</strong>/18/20<strong>10</strong> inspection rating: 4.099<br />

Scope <strong>of</strong> Work HBCR03A<br />

Estimated number <strong>of</strong> preliminary plans: 22<br />

Estimated number <strong>of</strong> final plans: 30<br />

1. PRELIMINARY DESIGN BUDGETARY ALLOWANCES:<br />

CORING/ Sampling $ 0<br />

ENCASEMENT REMOVAL $ 0<br />

PERMITS/ SAMPLING/ TESTING $ 5,000<br />

SURVEY $ 0<br />

FORCE ACCOUNT $ 0<br />

$ 5,000<br />

2. PRELIMINARY DESIGN CONTINGENCY ALLOWANCES:<br />

UNDERWATER INSPECTION: $ 0<br />

STEEL SAMPLING: $ 0<br />

FLAGGED CONDITIONS: $ 5,000<br />

$ 5,000<br />

3. PRELIMINARY DESIGN OUT OF POCKET ALLOWANCES: $ 9,000<br />

4. Final Design Budgetary Allowances: $ 6,000<br />

5. Final Design Contingency Allowances: $ 6,000<br />

6. Final Design Out <strong>of</strong> Pocket (OPE) Allowances: $ 11,000<br />

$ 23,000<br />

<strong>10</strong>. BIN: 2-24231-9 YEAR BUILT: 1923<br />

FEATURE CARRIED: GRAND CONCOURSE; FEATUE CROSSED: E 174 th ST.<br />

Existing super structure: 1 span concrete arch deck; 5 lanes ea; 3/26/20<strong>10</strong> inspection rating: 4.067<br />

Estimated number <strong>of</strong> preliminary plans: 14<br />

Estimated number <strong>of</strong> final plans: 18<br />

1. PRELIMINARY DESIGN BUDGETARY ALLOWANCES:<br />

CORING/ Sampling $ 0<br />

ENCASEMENT REMOVAL $ 0<br />

PERMITS/ SAMPLING/ TESTING $ 2,000<br />

SURVEY $ 0<br />

FORCE ACCOUNT $ 0<br />

$ 2,000<br />

2. PRELIMINARY DESIGN CONTINGENCY ALLOWANCES:<br />

UNDERWATER INSPECTION: $ 0<br />

STEEL SAMPLING: $ 0<br />

FLAGGED CONDITIONS: $ 2,000<br />

$ 2,000<br />

3. PRELIMINARY DESIGN OUT OF POCKET ALLOWANCES: $ 5,000<br />

4. Final Design Budgetary Allowances: $ 2,000<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!