SPECIAL CONDITIONS<br />

1. The contractor should satisfy themselves fully with the nature and site of work before<br />

offering their tenders. Any ignorance afterwards will not be considered.<br />

2. Tenders without earnest money or insufficient earnest money will be out rightly rejected and<br />

there will be no in position on the body of the contractor statement.<br />

3. Contractors are required to furnish up to date tax clearance certificates in respect of I.T. &<br />

S.T. copy of registration of contract failing which their may be rejected.<br />

4. Conditionals tenders will not be accepted.<br />

(a) If the tenderers is company or firm, copy of partnership deed of attorney must be enclosed<br />

with the tenders.<br />

5. After approval of rate by the competent authority, contractor shall have to deposite the initial<br />

security money in shape of N.S.C. (Post office time deposite pass book) duly pledged to the<br />

Executive Engineer, R.C.D, Road Division, Chatra within 10 days from the date of receipt of<br />

the written order from the Engineer-In-Charge failing which earnest money will be forfeited.<br />

6. Authority reserves right to reject any or all of the tenders or to distribute the work among<br />

more contractors without assigning any reason.<br />

7. No claim for idle labour due to stoppage of work or non-supply of materials drawings and<br />

designs or any delay due to condition beyond the control of <strong>department</strong> shall be entertained.<br />

8. The contractor shall have to arrange necessary site for accommodation and the facilities.<br />

medical etc for their labours or other staff cost and initiatives as well and will abide by the<br />

labour rules enforces under labour act as amended from time to time.<br />

9. The contractor shall be fully responsible for any damage to loss to the public property due to<br />

negligence of their labours or other staffs and the damage shall be made good at their own<br />

cost.<br />

10. The specification of Road Circle, Hazaribag and I.R.C. specification shall be followed during<br />

the execution of the work. In case of any difference of opinion between the <strong>department</strong> and<br />

the contractor concerning works the direction and the orders of the Superintending Engineer,<br />

R.C.D., Road Circle, Hazaribag will be final and conclusive.<br />

11. No claim shall be entertained due to fluctuation in rates of labour and materials at any time<br />

during the period of the work.<br />

12. Materials recoverable or non recoverable (direct issued to work) shall be issued to the<br />

contractor on proper hand receipt. Recovering of cost of materials will be made for the gross<br />

quantity issued and not for the quantity consumed in proportion to the work billed for the<br />

materials issued in excess of requirement beyond the circle analysis the recovery of the cost<br />

of excess materials will be double the issue rates as stipulates in the agreement.<br />

13. The contractor deploying trucks for carriage of materials and other work shall be to abide by<br />

the latest rules of Motor Vehicle Act, Bihar.<br />

14. It will be obligatory on the part or the tenderers to keep his tender open for a period of 6<br />

months (180 days) from the date of opening of tender for acceptance.<br />

15. The contractor shall not be entitled to any claim or compensation for any loss sustained by<br />

him due to.<br />

(a) Natural Calamities.<br />

(b) Difficulties in procurement transportation and<br />

(c) Circumstances beyond the control of the state government.