SPECIAL CONDITIONS<br />
1. The contractor should satisfy themselves fully with the nature and site of work before<br />
offering their tenders. Any ignorance afterwards will not be considered.<br />
2. Tenders without earnest money or insufficient earnest money will be out rightly rejected and<br />
there will be no in position on the body of the contractor statement.<br />
3. Contractors are required to furnish up to date tax clearance certificates in respect of I.T. &<br />
S.T. copy of registration of contract failing which their may be rejected.<br />
4. Conditionals tenders will not be accepted.<br />
(a) If the tenderers is company or firm, copy of partnership deed of attorney must be enclosed<br />
with the tenders.<br />
5. After approval of rate by the competent authority, contractor shall have to deposite the initial<br />
security money in shape of N.S.C. (Post office time deposite pass book) duly pledged to the<br />
Executive Engineer, R.C.D, Road Division, Chatra within 10 days from the date of receipt of<br />
the written order from the Engineer-In-Charge failing which earnest money will be forfeited.<br />
6. Authority reserves right to reject any or all of the tenders or to distribute the work among<br />
more contractors without assigning any reason.<br />
7. No claim for idle labour due to stoppage of work or non-supply of materials drawings and<br />
designs or any delay due to condition beyond the control of <strong>department</strong> shall be entertained.<br />
8. The contractor shall have to arrange necessary site for accommodation and the facilities.<br />
medical etc for their labours or other staff cost and initiatives as well and will abide by the<br />
labour rules enforces under labour act as amended from time to time.<br />
9. The contractor shall be fully responsible for any damage to loss to the public property due to<br />
negligence of their labours or other staffs and the damage shall be made good at their own<br />
cost.<br />
10. The specification of Road Circle, Hazaribag and I.R.C. specification shall be followed during<br />
the execution of the work. In case of any difference of opinion between the <strong>department</strong> and<br />
the contractor concerning works the direction and the orders of the Superintending Engineer,<br />
R.C.D., Road Circle, Hazaribag will be final and conclusive.<br />
11. No claim shall be entertained due to fluctuation in rates of labour and materials at any time<br />
during the period of the work.<br />
12. Materials recoverable or non recoverable (direct issued to work) shall be issued to the<br />
contractor on proper hand receipt. Recovering of cost of materials will be made for the gross<br />
quantity issued and not for the quantity consumed in proportion to the work billed for the<br />
materials issued in excess of requirement beyond the circle analysis the recovery of the cost<br />
of excess materials will be double the issue rates as stipulates in the agreement.<br />
13. The contractor deploying trucks for carriage of materials and other work shall be to abide by<br />
the latest rules of Motor Vehicle Act, Bihar.<br />
14. It will be obligatory on the part or the tenderers to keep his tender open for a period of 6<br />
months (180 days) from the date of opening of tender for acceptance.<br />
15. The contractor shall not be entitled to any claim or compensation for any loss sustained by<br />
him due to.<br />
(a) Natural Calamities.<br />
(b) Difficulties in procurement transportation and<br />
(c) Circumstances beyond the control of the state government.