3.15 (a) The <strong>department</strong>al materials shall be issued to the Contractor on proper Hand<br />

Receipt and further rules to this effect shall be subject to the N.I.T.<br />

Agreement, P.W.D. codes and <strong>department</strong>al instructions.<br />

(b) Where it was envisaged that container is to be returned, the same shall be<br />

returned in good condition. In case contractor does not return the same in<br />

good condition the cost of container shall be charged at recovery/prevalent<br />

rates. If the container is not returned at all the cost of the same along with<br />

materials will be recovered from the contractor’s bill at Panel Rate (since<br />

when the contractor does not return the container at all, it will be deemed that<br />

there has been misuse of <strong>department</strong>al materials and cost of materials along<br />

with container shall be recovered at panel rate)<br />

3.16 The materials shall be supplied from the approved quarries. Before using the<br />

materials in <strong>works</strong>, samples of materials are got to be approved from the Competent<br />

Authority.<br />

3.17 Quality Control Test shall be carried out as required as per M.O.R.T.&.H.,<br />

Specifications, Govt. of India. If the quality of materials fails below the acceptable<br />

standard, the contractor shall have to remove such inferior materials at his own cost.<br />

3.18 The contractor shall rectify at his own cost if in case the work is found to be<br />

defective during checking and liability period.<br />

3.19 Steel Bars, Joists, Angles etc. will issued in length if available in the <strong>department</strong>al<br />

stores. Their cut pieces in length less than 10 cm. shall not be taken back.<br />

3.20 The contractor will have to use his own machinery as per clause 1.5 for the<br />

construction of the work within the time specified in the contract. The carriage of<br />

machinery to different sites under the contract, from one place to another for this<br />

work will be the responsibility of the contractor and all expenses in this regard will<br />

be born by him.<br />

3.21 For work costing more then Rs. 50 lakhs, it will be obligatory for the contractor to<br />

keep properly equipped testing laboratory near the work site at his own cost where<br />

he will get the sample tested by the <strong>department</strong>.<br />

3.22 It will be the responsibility of the contractor to pay royalty of Mine’s materials. The<br />

contractor shall submit form “M” & “N” duly filled as per ‘Bihar’ Mines and<br />

Mineral Act, 1972.<br />

3.23 The contractor shall display a sign board at work-site about the work as on the<br />

format prescribed by the Engineer-in-Charge.<br />

3.24 The contractor shall furnish his programme of construction for execution of the<br />

work within the stipulated time schedule together with methodology of construction<br />