Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(2) Table log of deployaent of PUSSes (second deployment)<br />
PUSS 1 (INSTRUMENT 9) REDEPLOYED<br />
28.09.87<br />
TIME/GMT<br />
07:47:00<br />
08:01:36<br />
08:02: 11<br />
08:02:30<br />
08:03:48<br />
08:04:00<br />
08:05:00<br />
08:05:23<br />
08:06:00<br />
08:06:35<br />
08:06:49<br />
08:07:35<br />
08:07:52<br />
08:08:15<br />
08:08:32<br />
08:09:25<br />
08:09:38<br />
08:10:20<br />
08:10:30<br />
08:10:42<br />
08:10:48<br />
08:10:55<br />
08: 11:04<br />
08: 11:22<br />
08: 11: 32<br />
08:12:00<br />
08:12:25<br />
AT POSITION 3<br />
ACTION/COHHBNT<br />
PUSS ready for deployment<br />
Deployment commencing<br />
PUSS in the water<br />
PUSS away, paying out wire<br />
Vater depth 70 m<br />
PUSS DOVN - POSITION FIX. Veight outboard, stopped paying<br />
out wire<br />
Shackling weight onto wire<br />
Finished fixing position - water 70 m<br />
+3 m moved since PUSS down position<br />
Order to heave forward, weight away<br />
Paying out wire and heaving forward<br />
+5 m heaved forward<br />
+10 m heaved forward<br />
+15 m heaved forward<br />
Buoy outboard +20 m heaved forward<br />
Stopped paying out wire for a while until 30 m heaved forward<br />
Steady at 20 m from PUSS position<br />
Steady at 20 m from PUSS position<br />
+25 m heaved forward<br />
+31 m heaved forward, paying out remainder of wire<br />
+34 m heaved forward<br />
+39 m stopping heaving<br />
Veight on bottom +43 from PUSS<br />
+48 m from PUSS site<br />
+50 m from PUSS site<br />
+52m steady, all wire out<br />
+48 m from PUSS site<br />
105