Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix H: Photographic record of the experiment.<br />
Cover<br />
Frontispiece<br />
collage<br />
Plate 1<br />
Plate 2<br />
Plate 3<br />
Plate 4<br />
Plate 5<br />
Plate 6<br />
Plate 7<br />
Plate 8<br />
Plate 9<br />
Plate 10<br />
Plate 11<br />
Plate 12<br />
Plate 13<br />
Plate 14<br />
Plate 15<br />
RMAS Salmaster from Forth Road Bridge (Fergus I. McTaggart)<br />
Flags flown by RMAS Salmaster.<br />
British Geological Survey equipment container being loaded<br />
onto RMAS Salmaster<br />
Foredeck of RMAS Salmaster at sea.<br />
Shot point mooring buoys on foredeck of RMAS Salmaster.<br />
Orange shot point buoy and crate containing MSF radio time<br />
receiver for signal timing on analogue tape data recorders.<br />
Recording Laboratory for hydrophone strings and the BGS<br />
Sea Bottom Package in portacabin between decks on RMAS<br />
Salmaster.<br />
Checking and testing laboratory for Pull-Up Sea-bottom<br />
Seismometers (PUSSes) on RMAS Salmaster<br />
Syledis computer for high accuracy navigation and<br />
positioning at sea.<br />
Oubit monitor of Syledis navigational system mounted on the<br />
Bridge of RMAS Salmaster.<br />
Oubit monitor screen in action. Note the target position at<br />
the centre of the bulls-eye, the current position of RMAS<br />
Salmaster some 1200m north and the line representing a<br />
section of the experiment great circle from the shot point<br />
to Tentsmuir.<br />
PUSS, pressure sealed tube end.<br />
PUSS, tube end removed.<br />
PUSS instrumentation wired up at sea for testing and setting<br />
of recording time windows prior to deployment.<br />
Final preparations of PUSS on deck immediately prior to<br />
deployment. Note quarter tonne anchor weights in background.<br />
PUSS tube on deck fully prepared for deployment. Note<br />
hydrophone strapped to the tube and the dumb-bell weights at<br />
both ends of the tube.<br />
PUSS being lowered into the sea at deployment.<br />
Toroidal buoy used to mark the position of PUSS deployment<br />
for eventual retrieval. Note the radar reflector and<br />
flashing lamp installed on the superstructure.<br />
PUSS toroidal buoy at deployment.<br />
190