Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
Download (6Mb) - NERC Open Research Archive
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PUSS 3 (INSTRUMENT 11) REDEPLOYED<br />
27.09.87<br />
TIME/GMT<br />
18:55:45<br />
18:59:46<br />
19.01. 00<br />
19:02:15<br />
19:02:41<br />
19:03:33<br />
19:03:45<br />
19:04:09<br />
19:04:55<br />
19:05:44<br />
19:06:50<br />
19:07:15<br />
19:07:35<br />
19:08:31<br />
19:08:58<br />
19:09:09<br />
19:09:30<br />
19:10:00<br />
19:10:41<br />
19: 11: 15<br />
19: 11:45<br />
19:11:58<br />
19:12:15<br />
AT POSITION 2<br />
ACTION/COMMENT<br />
PUSS ready for deployment<br />
Commencing deployment, drifting at 30 m/min.<br />
PUSS outboard<br />
PUSS in water<br />
PUSS away, paying out wire as fast as possible as drift rate<br />
high<br />
Drift rate 12 m/min<br />
8 m/min drift, water depth 70 m<br />
PUSS DOWN, POSITION FIX<br />
Veight outboard<br />
Position fix complete - 70 m water<br />
Stopped drifting, +7 m drift from PUSS site<br />
Veight away<br />
Paying out rest of wire quickly, heaving forward<br />
+10 m heaved forward<br />
+15 m heaved forward<br />
Veight on bottom<br />
Buoy outboard<br />
+20 m heaved forward<br />
Vire all out, +25 m no drift<br />
+30 m heaved forward<br />
Buoy outboard<br />
125 m heaved forward<br />
Buoy away<br />
108