04.08.2013 Views

Download (6Mb) - NERC Open Research Archive

Download (6Mb) - NERC Open Research Archive

Download (6Mb) - NERC Open Research Archive

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix C: Locations of sites at second deployment<br />

Locations as on 29.9.87 when the 4500 lb and 900 lb charge were successfully<br />

detonated and recorded.<br />

(1) SHOT POINT: SHACKLE RING<br />

Class 5 mooring. Fix on shackle ring by approach of Salmaster to ring, locate<br />

ring between horns.<br />

(a) First positioning of shot point.<br />

Beacons:<br />

Fixed at:<br />

VBI, GIR, INV<br />

20.9.87<br />

Depth: 76.25 m (including draught)<br />

Fix: 57°06.972N 00045.032V<br />

a V = .009<br />

+5 m<br />

Accuracy on fix: 20 fixes over 250s, a - 1.5 m<br />

Decca error: green 150 m, purple 80 m<br />

Ship moving to shackle with heading of 80°<br />

(b) Second positioning of shot point.<br />

Beacons:<br />

Fixed at:<br />

Depth:<br />

VBI, GIR, INV<br />

14:02 on 30.9.87<br />

76 m (including draught)<br />

Fix: (average of 2): 57°06.996N 0004S.040V<br />

aN = .003<br />

+3 m<br />

a V = .001<br />

+lm<br />

Accuracy on fix: Seven fixes taken, average of first two accepted while<br />

Salmaster stationary with ring between the horns<br />

(anchor cable tension on buoy created slight movement).<br />

112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!