04.08.2013 Views

Lingza - Ministry of Power

Lingza - Ministry of Power

Lingza - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Shape Circular, Steel Lined<br />

Length 900 M (Inclined)<br />

Diameter 2 M<br />

No. Of Adits (3.3 M Dia D-Shaped)<br />

POWER HOUSE<br />

Type And Location Under Ground; Left Bank<br />

Design Discharge 18.47 Cumecs<br />

Type Of Turbine Vertical Pelton<br />

<strong>Power</strong> House Size 100 M X 17m X 40m<br />

Gross Head 746 M<br />

Rated Net Head 736m<br />

Centre Line Of M/C 1097m<br />

Installed Capacity 120 Mw<br />

TAILRACE TUNNEL<br />

Shape And Size Horse Shoe, 3.3 M Dia<br />

Length 250 M<br />

Tail Water Level El.1095 M<br />

SWITCHYARD<br />

Size 200M X 150 M<br />

POWER GENERATION<br />

Installed capacity 120 MW<br />

Annual Energy generation in a 90%<br />

dependable year & 95% machine<br />

availability<br />

5<br />

477.51MU<br />

Preliminary Feasibility Report<br />

<strong>Lingza</strong> HE Project (3 x 40 MW)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!