14<br />

Preliminary Feasibility Report<br />

<strong>Lingza</strong> HE Project (3 x 40 MW)<br />

The objective <strong>of</strong> the system development is to evolve self-sufficient regional grid catering<br />

to the individual regional power demands. It is also aimed at achieving the maximum<br />

benefits from integrated operation, through a proper mix <strong>of</strong> thermal and hydro generation<br />

and ultimately to tie the five regional grids together to form a strong National <strong>Power</strong><br />

Gird, providing even greater reliability.<br />

The proposed <strong>Lingza</strong> Hydro electric project located in north Sikkim is envisaged to feed<br />

power at a pooling point near Teesta III H.E. Project (Approx 2 Km from Teesta-III) via<br />

one double circuit line.<br />

2.2.2 <strong>Power</strong> Position in North Sikkim Region.<br />

The total installed capacity in Eastern Region is 16696.68 MW.Out <strong>of</strong> this only 2459.51<br />

MW is hydel installation. Thus the Hydro-thermal mix is 15:85, which is well below the<br />

national average <strong>of</strong> 25:75 and desirable ratio <strong>of</strong> 40:60.<br />

The power supply position for Eastern region during 10 th and 11 th Five Year Plans is<br />

summarised in Table2.1. The power and energy availability and requirements during and<br />

after 10 th Plan period in the Eastern Region is shown in Tables as projected in the 16 th<br />

Electric <strong>Power</strong> Survey, published by CEA.<br />

Even considering the coordinated operation <strong>of</strong> existing hydro and thermal stations, as<br />

well as benefits from ongoing projects and also from the schemes cleared by CEA, the<br />

Eastern region is expected to face peak power and energy deficits during most <strong>of</strong> the 10 th<br />

five Year Plan. The power situation in the region is dynamic and it is expected that the<br />

power generated from this project shall be cheap and helpful to the region as compared to<br />

thermal and other expensive power in the region.