2.2.3 Load Demand & <strong>Power</strong> Position <strong>of</strong> Eastern Grid<br />

Table-2.1 shows the power supply position <strong>of</strong> Eastern grid up to 2011-12.<br />

2.3 NECESSITY OF THE PROJECT AND RELATED ASPECTS<br />

16<br />

Preliminary Feasibility Report<br />

<strong>Lingza</strong> HE Project (3 x 40 MW)<br />

The need for <strong>Lingza</strong> H.E.Project has been considered in the context <strong>of</strong> increasing demand<br />

<strong>of</strong> power in the eastern region. It has been assumed that eastern region will have energy<br />

requirements at the rate 10% per annum rise <strong>of</strong> each year. This is a run <strong>of</strong> the river<br />

scheme in Teesta basin in North Sikkim District, Sikkim. It will generate 477.51 MU in<br />

90% dependable year (1976-77) with 95% machine availability.<br />

The proposed <strong>Lingza</strong> Hydro Electric project located in north Sikkim is envisaged to feed<br />

power at a pooling point near Treesta-III H.E. Project (Approx 2 Km from Teesta III)<br />

through one 220 KV double circuit line.