- Page 3 and 4: CHAPTER I TABLE OF CONTENTS DESCRIP
- Page 5 and 6: TITLE ANNEXURES Preliminary Feasibi
- Page 7: 1.0 INTRODUCTION CHAPTER-I EXECUTIV
- Page 11 and 12: Shape Circular, Steel Lined Length
- Page 13 and 14: • Study of existing infrastructur
- Page 15 and 16: Civil works : 527.68 Electro Mechan
- Page 17 and 18: 2.1 GENERAL INFORMATION 2.1.1 Intro
- Page 19 and 20: 12 Preliminary Feasibility Report L
- Page 21 and 22: 14 Preliminary Feasibility Report L
- Page 23 and 24: 2.2.3 Load Demand & Power Position
- Page 25 and 26: Preliminary Feasibility Report Ling
- Page 27 and 28: 3.2 SOCIO-ECONOMIC AND OTHER ASPECT
- Page 29 and 30: 3.2.5 Trade & Industry 21 Prelimina
- Page 31 and 32: v) Teesta Stage-V 23 Preliminary Fe
- Page 33 and 34: 25 Preliminary Feasibility Report L
- Page 35 and 36: CHAPTER-IV 26 Preliminary Feasibili
- Page 37 and 38: Central Crystalline Gneissic Comple
- Page 39 and 40: 30 Preliminary Feasibility Report L
- Page 41 and 42: 32 Preliminary Feasibility Report L
- Page 43 and 44: Preliminary Feasibility Report Ling
- Page 45 and 46: 35 Preliminary Feasibility Report L
- Page 47 and 48: 37 Preliminary Feasibility Report L
- Page 49 and 50: 39 Preliminary Feasibility Report L
- Page 51 and 52: 41 Preliminary Feasibility Report L
- Page 53 and 54: (iii) Based on observed G&D data at
- Page 55 and 56: • Unit Hydrograph technique 45 Pr
- Page 57 and 58: Table 5. 5 Comparison Of Various Fl
- Page 59 and 60:
AVERAGE 10-DAILY DISCHARGE 49 Preli
- Page 61:
51 Preliminary Feasibility Report L
- Page 66 and 67:
6.1 INTRODUCTION CHPAPER-VI CONCEPT
- Page 68 and 69:
56 Preliminary Feasibility Report L
- Page 70 and 71:
58 Preliminary Feasibility Report L
- Page 72 and 73:
6.3 FURTHER STUDIES 6.3.1 Topograph
- Page 74 and 75:
62 Preliminary Feasibility Report L
- Page 76 and 77:
6.4.11 Instrument And Remote Contro
- Page 78 and 79:
7.1 GENERAL CHAPTER-VII POWER POTEN
- Page 80 and 81:
Net operating head =MDDL+2/3 (FRL-M
- Page 82 and 83:
Month JUNE JULY AUGUST SEPTEMBER OC
- Page 84 and 85:
TABLE 7.3 70 Preliminary Feasibilit
- Page 86 and 87:
S. No. 1 2 3 4 5 6 7 8 9 10 11 TABL
- Page 88 and 89:
Period Yearly inflow (M Cum) Annual
- Page 90 and 91:
INCREMENTAL MW?MU/?MW 2.50 2.00 1.5
- Page 92 and 93:
TABLE 7.7(B) 78 Preliminary Feasibi
- Page 94 and 95:
TABLE7.7 (D) ENERGY GENERATION IN Y
- Page 96 and 97:
TABLE 7.7 (F) ENERGY GENERATION IN
- Page 98 and 99:
TABLE7.7 (H) ENERGY GENERATION IN Y
- Page 100 and 101:
TABLE7.7 (J) ENERGY GENERATION IN Y
- Page 102 and 103:
TABLE 7.7 (L) ENERGY GENERATION IN
- Page 104 and 105:
TABLE 7.7 (N) ENERGY GENERATION IN
- Page 106 and 107:
TABLE 7.7 (P) ENERGY GENERATION IN
- Page 108 and 109:
TABLE 7.7 (R) ENERGY GENERATION IN
- Page 110 and 111:
TABLE 7.7 (T) ENERGY GENERATION IN
- Page 112 and 113:
Preliminary Feasibility Report Ling
- Page 114 and 115:
Preliminary Feasibility Report Ling
- Page 116 and 117:
100 Preliminary Feasibility Report
- Page 118 and 119:
102 Preliminary Feasibility Report
- Page 120 and 121:
104 Preliminary Feasibility Report
- Page 122 and 123:
Educational Facilities 106 Prelimin
- Page 124 and 125:
108 Preliminary Feasibility Report
- Page 126 and 127:
9.5.3 Impacts on Air Environment 11
- Page 128:
112 Preliminary Feasibility Report
- Page 137 and 138:
CHAPTER - X INFRASTRUCTURE 10.1 EXI
- Page 139 and 140:
122 Preliminary Feasibility Report
- Page 141 and 142:
Preliminary Feasibility Report Ling
- Page 143 and 144:
124 Preliminary Feasibility Report
- Page 145 and 146:
126 Preliminary Feasibility Report
- Page 148 and 149:
INFRASTRUCTURE Acquisition of priva
- Page 150 and 151:
CHAPTER -XII COST ESTIMATES 130 Pre
- Page 152 and 153:
132 Preliminary Feasibility Report
- Page 154 and 155:
ABSTRACT OF COST OF WORKS 134 Preli
- Page 156 and 157:
3.0 Pre-Construction Stage Investig
- Page 158 and 159:
138 Preliminary Feasibility Report
- Page 160 and 161:
S. N. DIVERSION TUNNELS 140 Prelimi
- Page 162 and 163:
DAM 142 Preliminary Feasibility Rep
- Page 164 and 165:
J-POWER PLANT APURTENANCE (CIVIL WO
- Page 166 and 167:
S. N. DESILTING CHAMBER (INCLUDING
- Page 168 and 169:
S. N. HEAD RACE AND TAIL RACE TUNNE
- Page 170 and 171:
S. N. PRESSURE SHAFTS AND PENSTOCKS
- Page 172 and 173:
S. N. SWITCH YARD 152 Preliminary F
- Page 174 and 175:
154 Preliminary Feasibility Report
- Page 176 and 177:
Sl No K-BUILDINGS Description Plint
- Page 178 and 179:
158 Preliminary Feasibility Report
- Page 180 and 181:
DISTRIBUTION OF COST UNDER HEAD Q -
- Page 182 and 183:
S. No. V - RECEIPT & RECOVERIES Ite
- Page 184 and 185:
14 15 S.No. Marine frieght and insu
- Page 186 and 187:
Preliminary Feasibility Report Ling
- Page 188 and 189:
167 Preliminary Feasibility Report
- Page 190 and 191:
169 Preliminary Feasibility Report
- Page 192 and 193:
UNIT COST OF ENERGY AT BUS BAR AT C
- Page 194 and 195:
173 Preliminary Feasibility Report
- Page 196 and 197:
DIVERSION BED LEVEL : 1055 m. PANAN
- Page 198 and 199:
27° 45' 40' 35' 27° 30' 88° 15'
- Page 200 and 201:
LINGZA H.E. SCHEME - SIKKIM PLATE 4
- Page 202 and 203:
2000 2000 2200 2400 2600 2800 RINGP
- Page 204 and 205:
2000 PROPOSED ROAD 1800 1600 1400 1
- Page 206 and 207:
L7 L6 ? L5 L4 125000 L3 ? L2 ? 3000
- Page 208 and 209:
HRT3.3 M. Ø Ø3300 Ø10000 TYP. SE
- Page 210:
Preliminary Feasibility Report Ling
- Page 213 and 214:
The area around the proposed projec
- Page 215 and 216:
Neogi et al (1986) have clubbed tog
- Page 217 and 218:
compositional banding in metasedime
- Page 219 and 220:
evident. The latter graben is consi
- Page 221:
REFERENCE Chakraborti, B., and Bane
- Page 224 and 225:
founded on sandy soil is higher tha
- Page 226 and 227:
X Some well built wooden structures
- Page 228 and 229:
1940 8 2 3 3 59 . 0 28 . 00 90 . 50
- Page 230 and 231:
1988 5 10 7 16 16 . 1 25 . 32 90 .
- Page 232 and 233:
1997 1 25 20 8 28 . 7 30 . 00 88 .
- Page 234 and 235:
2000 10 3 17 8 22 . 4 26 . 88 89 .
- Page 236 and 237:
TITLE ANNEXURES 6.2 Preliminary Fea
- Page 238 and 239:
studies methodologies has been furn
- Page 240 and 241:
REPLY ON COMMENTS OF CEA (HP & I )
- Page 242 and 243:
REPLY ON COMMENTS OF SP&PA DIVISION
- Page 244 and 245:
REPLY ON COMMENTS OF CMDD DIRECTORA