v) Teesta Stage-V<br />

23<br />

Preliminary Feasibility Report<br />

<strong>Lingza</strong> HE Project (3 x 40 MW)<br />

A diversion dam has been proposed d/s <strong>of</strong> confluence <strong>of</strong> Dikchu chu and Teesta river and<br />

a power house near the village Sherwani. The scheme shall have installed capacity <strong>of</strong> 510<br />

MW.<br />

vi)Teesta Stage-VI<br />

<strong>Power</strong> Potential <strong>of</strong> Rangit Basin It envisages construction <strong>of</strong> a 76 m high concrete dam<br />

near Khanitar d/s <strong>of</strong> the confluence <strong>of</strong> the Teesta and Rongni chu in East Sikkim and the<br />

power house near the village Namthang/Tarkhola in South Sikkim with installed capacity<br />

<strong>of</strong> 360 MW.<br />

Rangit Basin<br />

The hydropower development <strong>of</strong> Rangit river was identified in four stages as under :<br />

i) Rangit HE Project Stage –I<br />

The Rathong chu, a major perennial tributary <strong>of</strong> Rangit river has a very steep bad slop.<br />

The river takes a big loop near Yoksum. It is proposed to divert the water <strong>of</strong> Rathong chu<br />

at an elevation <strong>of</strong> about 2300 m U/S <strong>of</strong> Yoksum to elevation <strong>of</strong> 100 m near village<br />

Thingtom. The scheme shall generate 47 MW <strong>of</strong> power at 60 % load factor.<br />

ii) Rangit HE Project Stage-II<br />

It is proposed to divert the water <strong>of</strong> Rimbhi chu near Sigglitem and allow the water to<br />

drop through 425 m near Lingchum on Kalet chu to generate 10 MW <strong>of</strong> power at 60%<br />

load factor.<br />

iii) Rangit HE Project Stage –III<br />

A dam has been constructed just d/s <strong>of</strong> confluence <strong>of</strong> Rathong chu and Rangit river and a<br />

power house near the village Mongbru. The installed capacity <strong>of</strong> the scheme is 60 MW.<br />

The project has been commissioned by NHPC in the year 1999 and is in operation.<br />

iv) Rangit HE Project Stage-IV<br />

The scheme shall utilize a drop <strong>of</strong> 110 m from an elevation <strong>of</strong> 440 m to 355 m in Reshi<br />

loop. The scheme shall generate 18 MW <strong>of</strong> power at 60 % load factor.